ML19273B809
| ML19273B809 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/24/1979 |
| From: | Manry M GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7906140414 | |
| Download: ML19273B809 (1) | |
Text
i s
a J. P 0'R0Lif R_0__T_E_ttanAn r0nmi W.
i P.
CNIn004 i
a 01 tmxitY. Ct0RG!A 31513 F. 1 LDNG \\
W. & KE'meer j
PMS Mt. JAMES P. O'ht.ltLY Qb Q C pu.y*y^
L T. W
}
~
t E. N tittlirD 51A1TS Mtict rah n[GULARDitY C0tetiSS10rt D11!I.C10H Or INSPECT 10 t Nfil [Hf 0ltCENLHT AI f1Y a REGIDH 11
~
P3 58 ;g]~M ;
Stil1r 3100 101 HAltiLITA STREET 3d a y-
'g } W 25 A11NffA. GEORGIA 30303 SulkitCT: MlCil UM117. DOCKr.T NO. 50-366, N011rlCAT10tf Or REPORTAIILE OCCURRENCE MO. 50-366/1979-39 M011111D: Ross T. R09em DAlt.: 5-24-79 DATE: 5-24-79 TIME: 2:13 PM DESCRIP110tf Of REPORTABLE OCCURRIMCE Mille shutdwn on 5-24-79 for Anchor holt inspection and Repair. it, was discovered that the following valves which were originally judoed to have acceptable leak rate values per Tech. Spec. 3.6.1.2 and 10CFR50 Appendix J (based on overa)1 leakape) when tested per IRfP-2-3952, did not reet the individual valve leak ate criteria per ASHC Section XI.
part IW: feedwater check valve 2B21-T0103, and futR ptzT suction valves 2E11-f004B. 2t11-F004C and 2E11-F004D.
It was originally interpreted that the ALHi. acceptance criteria did not go into effect until cormerttel operation; hwever, the interpretation that it took effect with issuanc?
of the operating license (6-13-78) caused the above valves to not nieet the A!J4E criteria.
There were no penannel overexposures or injuries and no releases of red-ioactive waterials as a result of this occurrence.
4x wwl2 nry Plant Mana r 2351 360
~
V m
kb 1
7 006140 y/Y
.T