Text
{{#Wiki_filter:. (= y,, s h / li i I l1 J LJ [11AlliE !!N!!iEE C : 52:G: ' ~ ~ ::
- TURNPIKE ROAD (RT. 9) j g
~ ENGINEERING OFFICE WESTBORO, M ASSACHUS ETTS 01081 O G 17-36G-5011 p 'N - *n 33 Q B.3.2.1 DIY 79-27 April 2, 1979 United States Nuclear Regulatory Cornission Wachington, D. C. 20555 Attention: Office of Nuclear Reactor Regulation Mr. Harold R. Denton, Director
Reference:
(a) License No. DPR-36 (Docket No. 50-309) (b) USNRC Order to Show Cause for MYAPC dated March 13, 1979
Dear Sir:
Subject:
Maine Yankee Answer to USNRC Order to Show Cause In accordance with the requirenents set forth in 10 CFR Part 50, we hereby submit thirty-four (34) additional copics of Maine Yankee's answer to the USNRC order to show cause, (Reference b). The original and five (5) copies of this answer were separately hand delivered to your office. In addition, we have also hand delivered to you, the Interim Report for the thine Yankee Atomic Power Station, dated April 1,1979, which was completed by Stone & Webster, and the Containnent Spray Piping Analysis of Pipe Supports H-51 and H-53. We trust this inforcation will be of service to you in performing an evaluation for Maine Yankee. Should you have any questions, please contact us at once. Very truly yours, MAINE YANREE ATOMIC POWER COMPANY . tW W. P Johnson Vice President
Enclosures:
- 1) Original and 5 copies of Licensee's answer to show cause order (provided separately).
- 2) Thirt.y-four (34) additional copies of Licensee's answer to rivt cause order.
3) Interim Report by Stone & Webster dated April 1,1979 (provided separately).
- 4) Containment Spray Piping Analysis of Pipa Supports H-51 and H-53 (Provided separately).
7904090 /7,2
UNITED STATES OF A IERICA !!UCLEAR REGULATORY COM:!ISSIO" before the DIRECTOR OF TJCLEAR REACTOR REGULATIC'; ) In the Matter of ) ) Docket !!o. 50-309 MAINE Y/d:REE ATOMIC FOUER COMPA'Ti ) Op. Lic. !!o. DPR-36 ) (Mainc Yankee Atcaic Power Station) ) ) LICENSEE'S A'? SUER TO THE ORDER TO SHO'.i CAUSE Pursuant to 10 CFR 5 2.202 Maine Yanhec Atonic Pcver Corpany (Maine Yankee or Licensec) the holder of Operating Licenec DPR-36 for P2inc Yankee Atonic Pcwcr Staticn (MYAPS) rakes ansucr to the Order to Shcw Cause (Order) issued by the Director of Nuc1 car Reactor Regulation (Director) under date of March 13, 1979 as follows: to the As required by 10 CFR 5 2.202(b) the Licenscc with respect various paragraphs of the Order: 1-6. Admits the allegations set forth in the first six paragraphs. 7. With respect., the allegations set forth in the seventh paragraph, admits the allegaticns set forth in the first two sentences, but says that the remainder of said seventh paragraph sets forth conclusions rather than allegations of fact and that therefore the Licensee is not called upon to adnit or deny the sace. 8-12. Says that the eighth through tucifth paragraphs are not allegations of f act which the Licensee is called upcn to adnit or deny. da nan oio 7
And further answering the Licensec says: The Order directed an innediate shutdown of MYAPS because 13. of the Director's finding that certain piping systens related to safety were analy:cd relative to carthquake loads by Stone & Webster using a conputer code that was incorrect in its treatment of the loads, i. e_. the loads were succed algebraically. Since the issuance of the Order, the Licensee has reanaly cd 14. the facility piping systems described in paragraph 13 for scisaic loads using an appropriate ecthod which does not sum loads algebraically. The above described analyses indicate that no codifications to 15. facility piping systees are neccesary. 16. Thus, no basis exists for the continued suspension of the facility operation as contemplated by the Order. WHEREFORE, Paine Yankee proposes: the Director codify or rescind so cuch of his Order of A. That March 13, 1979, as requires the continued shutdown of MYAPS.* to Mainc Yankee such other and further B. That the Director grant relief as is ncet and proper in the circumstances. MAINE YAZEE ATCMIC POWER COMPAW /[ o;n N N Mu Dated: March 30, 1979 By Ucndell P. Jchn#.r c n Vice President Counsc1: Thomas G. Dinnan, Jr. Ropes & Gray 225 Franklin Street Boston, MA 02110 617/423-6100
- The poucr of the Director to rescind or v.odify the Order insofar as it in force cold shutdoun of MYAPS (a cutcary orde-requires the urerently icr a hearing) is tcycnd questica in ligh' prior crportunity insued eithout licence nncntncnt or facility nctilicatica is required.
of the fact that no Ccnnare Port 1:nd General.icetric Cc. (Irojan : uclear Plant), CLI-75-2 4, CCl! ::uclea c ce r,. ..ep.. ara. JU,311 (July 7,1973) sie Consumern Pruer Comani (Midland Plant, Units 1 & 2), CLI-73-33, 6 AEC 10S2 (1973). _2_
CO>D'ONWEALT110F MASSACI USETTS March 30, 1979 L'orcester, ss. Then appeared before me the above-subscribed L'endell P. Johnson and made oath that he had read the f oregoing answer, was f amiliar with the contents thereof, and that the statecents set forth therein are true to the best of his knculedge. Before me,
- f. q '<, '-
s _E ~lz. g v(huAS Y /bl+ $-l'Lh Y' # .'O' Notary I'ublic ' r s,, My Commission Expires: 9/14/84 4 I t 4r =%.}}