ML19273B478

From kanterella
Jump to navigation Jump to search
Supplements 790206 Response to FOIA 790119 Request for Documents Re Licensing Process.Minutes for 720906 & 750225 Meetings Are in PDR & Lpdr.List of IE Insp Repts Encl
ML19273B478
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/15/1979
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sullivan W
KECK, MAHIN & CATE
References
FOIA-78-311 NUDOCS 7904060476
Download: ML19273B478 (5)


Text

~

( dcc b

~

j

/pa f og*p UNITED STATES yv

. 'a NUCLEAR REGULATORY COMMISSION j.h(3Q'j

'o[)d.

WASHINGTON, D. C. 20555 s

\\,

March 15,1979 Docket Nos. 50-373 50-374 Winnefred F. Sullivan, Esq.

Keck, Cushman, Mahin & Cate 8311 Sears Tower 233 South Wacker Drive IN RESPONSE REFER Chicago, IL 60606 TO F01A-78-311

Dear Ms. Sullivan:

This supplements our previous response dated February 6,1979 concerning your letter dated January 19, 1979 in which you requested, pursuant to the Freedom of Information Act, additional documents under F0IA-78-311 on scheduling at the La Salle County Station and meetings between Common-wealth Edison Company and AEC/NRC personnel during the licensing process.

In further response to your request, the additional documents listed in Appendix A are enclosed and copies are being placed in the NRC Public Document Room (PDR) located at 1717 H Street, N.W., Washington, D.C.

Minutes for the meetings held on September 6,1972, February 25, 1975 and July 28, 1976 are in the PDR and Local Public Document Room (LPDR) located at the Illinois Valley Community College, Rural Route #1, Oglesby, Illinois.

Minutes for the meetings listed by you as being held on December 22, 1975 February 23-25, 1972, fiarch 2, 1972, October 11, 1973 and January 16, 1974 cannot be located.

It appears that either the meetings on those dates never took place, or that if any did take place, a staff summary was not prepared.

In either case, no minutes can be found.

Appendix B lists the inspection report numbers for all inspections conducted relative to the La Salle County Station by the NRC's Region III Office of Inspection and Enforcement through January 31, 1979.

Copies of these reports may be obtained, at a cost of eight cents per page, as specified in 10 CFR 9.14(a) of the Commission' regulations, by writing to tne PDR in Washington, D.C. Copies are also available at the LPDR. Please note, however, that some of the reports for the inspections conducted in late 1978 or in 1979 may not be in the PDR or LPDR pending internal review by the Office of Inspection and Enforcement or proprietary review by the applicant / licensee.

Following completion of these reviews, 79040604 %

the reports will be placed in the PDR and LPDR.

Since ly, I

~

gf

/

-J.

elton, Director

[Y Division of Rules and Records Office of Administration

Enclosures:

As stated

APPENDIX A FOIA 78-311 1.

Memorandum dated February 23, 1971, from S. Varga to R. Boyd.

2.

Memorandum dated February 24, 1971, from L. Hulman to D. Nunn.

3. ' Memorandum' dated February 24, 1971, from S. Varga to R. Boyd.

4.

Memorandum dated April 8,1971, from S. Varga to R. Boyd.

5 Memorandum dated June 10, 19 71, f rom S. Varga to R. Boyd.

6.

Note to Files dated November 30, 1971 from L. Hulman.

7 Memorandum dated July 5, 1972, from D. A. Smith to D. R. Muller.

8.

Memorandum dated October 25, 1973, from G. W. Reinmuth to V. Vetter.

9 Meeting Summary dated March 4,1975 10.

Memorandum dated November 12, 1975, from V. J. Ross to G. K. Dicker.

11.

Memorandum dated January 20, 1976 from G. V. Reinmuth to B. H. Grier.

12.

Meeting Summary dated June 8, 1976.

13 Memorandum dated June 20, 1977, from H. R. Denton to E. G. Case.

14.

Memorandum dated June 24, 1976, from V. P. Gammill to R. C. DeYoung.

15 Summary of Appeals Meeting of July 29, 1976 dated August 16, 1976.

16.

Meeting Notice dated April 21, 1976.

17.

Notice of January 26, 1971 meeting between Division of Reactor Licensing (DRL) and Commonwealth Edison Company (CE), from D.F. Knuth (AEC) to P. A. Morris ( AEC),1/20/71.

18.

Notice of February 24, 1971 meeting, DRL and CE, from D.F. Knuth to P.A. Morris, 2/22/71.

19. Sumnary of March 25 - 26, 1971 meeting, DRL and CE, from S. Varga (AEC) to R.S. Boyd (AEC), 4/8/71.
20. Sumnary of February 25, 1975 meeting, NRC staff and CE, General Electric Company and Sargent

,id Lundy Engineers, from R. Powell (NRC) to 50-373 and 50-374 Docka' tile, 3/75.

~.

- 21.

Summary of July 27 - 28, 1976 meeting, NRC staff and CE, from J.D. Jackson (NR to V.A. Moore (NRC), 7/30/76.

22. Summary of July 29, 1975 meeting, NRC staff and CE, from 0.0. Parr (NRC) tc. LaSalle Docket File, 8/16/76.
23. Summary of July 27 - 28, 1976 meeting, NRC staff and CE by Region III inspector, M.J. Oestmann (NRC,RIII) to J.A. Pagliaro (NRC,RIII), 8/18/76.

24.

Notice of August 27, 1976 meeting, Region III staff and CE, E.L. Jordon (NRC) to W. Shewski (CE). 8/20/76.

25.

Transmittal letter for report nos. 50-373/76-06 and 50-374/76-06 and acknowledging the 8/27/7f meeting, E. L. Jordan to Byron Lee, Jr., (CE),

9/15/76.

26.

Notice of May 26, 1978 meeting between NRC, Region III and CE, 5/17/78.

27.

Letter re.lative to a June 16, 1978 meeting between Region III staff and CE, R.F. Heishman (NRC) to Byron Lee, Jr. (CE), 5/31/78.

28.

Letter relative to June 16, 1978 meeting, region III and CE, R.F. Heishman (NRC) to Byron Lee, Jr. (CE), 6/8/78.

29.

Letter summarizing June 16, 1978 meeting, Region III and CE, R.F. Heishman (NRC) to Byron Lee, Jr. (CE) 6/26/78.

APPENDIX B Listed below are the report numbers for all inspections ccnducted by Region III relative to the La Salle County Station Units 1 and 2, Docket Nos. 50-373 and 50-374.

Unit 1 Unit 2 50-373/71-01 50-374/71-01 72-01 and 72-02 72-01 and 72-02 73-01 thru 7 }04 73-01 thru 73-05 74-01 thru 74-04 74-01 and 74-02 75-01 thru 75-08 75-01 thru 75-10 76-01 thru 76-12 76-01 thru 76-10 77-01 thru 77-13 77-01 thru 77-12 78-01 thru 78-33 78-01 thru 78-23 79-01 thru 79-05 79-01 thru 79-05