ML19273B301

From kanterella
Jump to navigation Jump to search
Notification of 790329 Meeting W/Fuel Mfg Vendors (Westinghouse,Ge,Exxon Nuclear,C-E & B&W) in Denver,Co to Discuss Acceptance Criteria of Fuel Assembly Design for Seismic & LOCA Loads
ML19273B301
Person / Time
Issue date: 03/19/1979
From: Soon Kim
Office of Nuclear Reactor Regulation
To: Kniel K
Office of Nuclear Reactor Regulation
References
NUDOCS 7904060097
Download: ML19273B301 (1)


Text

e,O UNITED STATES 4

NUCLEAR REGULATORY COMMISSION W ASHIN G T ON, D. C. 20555 i

w4 ee -

e v

MEMORANDUM FOR:

K. Kniel, Chief, Core Performance Branch, 05S R.O. Meyer, Leader Reactor Fuels Sec' tion, CPB, OSS THRU:

S.B. Kim, Reactor Fuels Section, CPB, CSS FROM:

FORTHCOMING MEETING WITH FUEL MANUFACTURING

SUBJECT:

VENDORS DATE:

Thursday, March 29, 1979 TIME:

h gfcp cy, ;g,

RamadaInn(Airport-QuebecSt.), Denver, Colorado LOCATION:

Discussion on acceptance criteria of fuel PURPOSE:

assembly design for seismic and LOCA loads.

PARTICIPANTS:

CO.: Westinghouse, General Electric, Exxon Nuclear, Combustion Engineering, Babcock & Wilcox NRC:

S. Kim, R. Meyer, X. Kniel EG&G Consultants: R. Grubb, B. Saffell m

  1. angMo Kim S

Reactor Fuels Section Core Performance Branch Division of Systems Safety DISTRIBUTION R. Mattson/F. Schroeder R. Fraley, ACRS (16)

OR, SS&EA, PM, SS ads SD & RES ads I&E(3)

T. Novak Z. Rosztoczy W. Butler 79040600M Meeting Attendees NRC POR

~D.

Bunch

Contact:

S. Kim, x27603