MONTHYEARML19240A0352019-09-10010 September 2019, 30 September 2019, 29 October 2019, 4 November 2019, 5 November 2019, 15 January 2020 Nov 6, 2019 NEI Meeting on NEI 17-06 Project stage: Request ML19309E2982019-11-0505 November 2019 (NEI) Slides for November 6, 2019 NEI 17-05 Meeting Project stage: Meeting ML19273A8942020-01-15015 January 2020 November 6, 2019, Summary of Meeting to Discuss Nuclear Energy Institute 17-06 Project stage: Meeting ML20093A7332020-04-0101 April 2020 April 1, 2020 NEI Meeting on Digital I&C Iap MP#3 Attendees Project stage: Meeting ML20083F1492020-07-0606 July 2020 Summary of Meeting to Discuss Digital Instrumentation and Control, Integrated Action Plan, Modernization Plan #3, Acceptance of Digital Equipment, Nuclear Energy Institute 17-06 Project stage: Acceptance Review 2020-01-15
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML20083F1492020-07-0606 July 2020 Summary of Meeting to Discuss Digital Instrumentation and Control, Integrated Action Plan, Modernization Plan #3, Acceptance of Digital Equipment, Nuclear Energy Institute 17-06 ML20069A7452020-05-14014 May 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss WCAP-16097, Revision 5, Common Q Platform Topical Report ML19273A8942020-01-15015 January 2020 November 6, 2019, Summary of Meeting to Discuss Nuclear Energy Institute 17-06 ML19247C0532019-09-24024 September 2019 Summary of Meeting Between the NRC Staff and NEI to Discuss Revised Guidance Documents: Inspection Manual Chapter (IMC) 0326 and NEI 18-03 ML19226A1102019-09-0909 September 2019 Summary of August 21, 2019, Meeting to Discuss the Nuclear Procurement Issues Corporation Process and the Plans for Nuclear Energy Institute 17-06 ML19151A7552019-06-17017 June 2019 Summary of Meeting to Discuss Nuclear Energy Institute'S Perspective of American Society of Mechanical Engineers Code Compliance and Operability Determinations ML19064B4042019-03-13013 March 2019 Summary of Meeting Between the NRC Staff and the Nuclear Energy Institute Regarding Nei'S Perspective of ASME Code Compliance and Operability Determinations ML18302A0032019-01-15015 January 2019 Summary of Meeting to Discuss Operability Determination/Corrective Action Program Interface Definitions ML18305A7552019-01-15015 January 2019 Summary of Closed Teleconference on PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance. ML18267A0042018-10-0303 October 2018 Summary of Meeting to Discuss Digital Instrumentation and Control Integrated Action Plan, Modernization Plan #3 ML18204A0222018-10-0101 October 2018 August 30, 2018, Summary of Meeting to Discuss the Nuclear Energy Institute Introduction of Entry Criteria for Operability Determinations ML18232A1082018-09-26026 September 2018 Summary of 08/30/2018, Meeting to Discuss the Draft Safety Evaluation for PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (CAC No. MF8075; EPID L-2016-TOP-0006) ML18179A3622018-07-16016 July 2018 June 28, 2018, Operability Meeting Summary ML18155A0042018-07-0909 July 2018 Summary of May 24, 2018, Meeting to Discuss Digital Instrumentation and Control Common Cause Failure ML18142A2502018-06-0707 June 2018 Summary of Meeting with Nuclear Energy Institute and Industry to Discuss Anchor Darling Fate Valve Draft Temporary Instruction ML18136A5052018-05-30030 May 2018 Summary of Conference Call to Discuss the Use of Strategic Alliance for FLEX Emergency Response Resources to Support Exigent Situations ML18082A0292018-04-23023 April 2018 March 29, 2018, Summary of Meeting to Discuss the Roadmap for Proposed Industry-Wide Monitoring Program and RAI Response Templates ML18009A6382018-04-0909 April 2018 Summary of Biweekly Conference Calls to Discuss Fleet-Wide Response to Draft Requests for Additional Information Related to Generic Letter 2016-01 ML18065A0402018-03-26026 March 2018 February 14, 2018, Summary of Meeting with the Nuclear Encergy Institute and Industry to Discuss Anchor Darling Gate Valve Part 21 Issues ML17335A4232018-01-22022 January 2018 Summary for 12/13/2017 NEI 16-16 Meeting ML17331A4852017-12-22022 December 2017 Summary of 11/30/2017 Meeting on NEI 96-07, App D, Section 4.3.6 2020-07-06
[Table view] Category:Memoranda
MONTHYEARML20083F1492020-07-0606 July 2020 Summary of Meeting to Discuss Digital Instrumentation and Control, Integrated Action Plan, Modernization Plan #3, Acceptance of Digital Equipment, Nuclear Energy Institute 17-06 ML20069A7452020-05-14014 May 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss WCAP-16097, Revision 5, Common Q Platform Topical Report ML19273A8942020-01-15015 January 2020 November 6, 2019, Summary of Meeting to Discuss Nuclear Energy Institute 17-06 ML19247C0532019-09-24024 September 2019 Summary of Meeting Between the NRC Staff and NEI to Discuss Revised Guidance Documents: Inspection Manual Chapter (IMC) 0326 and NEI 18-03 ML19226A1102019-09-0909 September 2019 Summary of August 21, 2019, Meeting to Discuss the Nuclear Procurement Issues Corporation Process and the Plans for Nuclear Energy Institute 17-06 ML19151A7552019-06-17017 June 2019 Summary of Meeting to Discuss Nuclear Energy Institute'S Perspective of American Society of Mechanical Engineers Code Compliance and Operability Determinations ML19064B4042019-03-13013 March 2019 Summary of Meeting Between the NRC Staff and the Nuclear Energy Institute Regarding Nei'S Perspective of ASME Code Compliance and Operability Determinations ML18305A7552019-01-15015 January 2019 Summary of Closed Teleconference on PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance. ML18302A0032019-01-15015 January 2019 Summary of Meeting to Discuss Operability Determination/Corrective Action Program Interface Definitions ML18267A0042018-10-0303 October 2018 Summary of Meeting to Discuss Digital Instrumentation and Control Integrated Action Plan, Modernization Plan #3 ML18204A0222018-10-0101 October 2018 August 30, 2018, Summary of Meeting to Discuss the Nuclear Energy Institute Introduction of Entry Criteria for Operability Determinations ML18232A1082018-09-26026 September 2018 Summary of 08/30/2018, Meeting to Discuss the Draft Safety Evaluation for PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (CAC No. MF8075; EPID L-2016-TOP-0006) ML18213A2852018-08-13013 August 2018 Aug. 1, 2018 Summary of Closed Meeting with Doosan Hf Controls to Discuss the Revision of Amendment 4 to the Doosan Hf Controls-6000 Safety System ML18179A3622018-07-16016 July 2018 June 28, 2018, Operability Meeting Summary ML18155A0042018-07-0909 July 2018 Summary of May 24, 2018, Meeting to Discuss Digital Instrumentation and Control Common Cause Failure ML18082A0292018-04-23023 April 2018 March 29, 2018, Summary of Meeting to Discuss the Roadmap for Proposed Industry-Wide Monitoring Program and RAI Response Templates ML18065A0402018-03-26026 March 2018 February 14, 2018, Summary of Meeting with the Nuclear Encergy Institute and Industry to Discuss Anchor Darling Gate Valve Part 21 Issues ML17335A4232018-01-22022 January 2018 Summary for 12/13/2017 NEI 16-16 Meeting 2020-07-06
[Table view] |
Text
January 15, 2020 MEMORANDUM TO: Dennis C. Morey, Chief Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Joseph J. Holonich, Senior Project Manager /RA/
Licensing Processes Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF NOVEMBER 6, 2019, MEETING TO DISCUSS NUCLEAR ENERGY INSTITUTE 17-06 (EPID: L-2017-PMP-0009)
On November 6, 2019, U.S. Nuclear Regulatory Commission (NRC) staff held a Category 2 meeting with representatives from the Nuclear Energy Institute (NEI). The purpose of the meeting was to discuss and provide comments on NEI 17-06, Revision B, Guidance on Using IEC 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications. The agenda and all information related to the meeting and discussed in this summary can be found in the Agencywide Documents Access and Management System Package Accession No. ML19240A035.
In its opening remarks, NEI stated that NEI 17-06 was important guidance for plants to use while preparing to implement digital modifications. NEI also noted that NEI 17-06 would help licensees address plant safety review criteria. NEI then made its presentation on NEI 17-06 which included NEIs responses to the NRC staff comments on draft NEI 17-06, Revision B.
During the discussions following the presentation, the NRC staff noted that, if the staff decides to endorse NEI 17-06, the endorsement would need to address the guidance within the document. Plus, it would have to describe how the NEI 17-06 guidance dovetails with other NRC staff commercial grade dedication process requirements outlined in other regulatory guidance documents.
Further, the NRC staff explained that its reading of the NEI 17-06 title implies NEI 17-06 covers all that is needed to perform commercial grade dedication of digital equipment. However, the flowchart in NEI 17-06 points to other documents. The NRC staff recommended NEI consider renaming NEI 17-06 to something more limited in scope. The title could be related to how one would address the critical characteristic of dependability when assessing a products capabilities as part of Methods 2 and 4 of the staff endorsed commercial grade dedication process. The NRC staff expressed its concern that, as presently titled, the staff is worried licensees would attempt to use NEI 17-06 as a stand-alone document.
CONTACT: Joseph J. Holonich, NRR/DORL 301-415-7297
D. Morey A question asked by the NRC staff was whether NEI had considered holding workshops on NEI 17-06 during the endorsement evaluation. NEI stated that it had no workshop plans and none had been discussed. However, NEI agreed to take an action to consider holding workshops.
The Electric Power Research Institute (EPRI) report that enabled consideration of the process outlined within NEI 17-06 was also discussed at the meeting. The NRC staff reported that it had just received the EPRI report and had not yet reviewed it. This review could result in additional NRC staff comments on NEI 17-06. An action for the staff was to provide any additional comments on NEI 17-06 that arose from the review of the EPRI supporting document. These comments and an additional set of comments developed independent of the EPRI report would be provided to NEI by December 20, 2019.
One discussion centered on the observation of the accrediting body (AB) and the certifying body (CB). The NRC staff had participated in an observation of an AB performing an audit on a CB.
However, the NRC staff was also interested in observing a CB in specific aspects when performing certification activities as part of the staffs evaluation of NEI 17-06. NEI stated that the purpose of the EPRI report was to document the certification activities of interest and would fulfill the need of direct NRC staff observation. The NRC staff agreed to hold off on requiring such an observation until after reading the EPRI report.
NEI asked the NRC staff if it had any comments on the proposed draft Nuclear Procurement Issues Corporation (NUPIC) procedure for AB observations. The NRC staff indicated that it could not determine the acceptability because there were too many to be determined in the document. An action from the meeting was to convey the staffs concerns regarding the NUPIC observation procedure during the biweekly scheduling calls.
A stakeholder noted that there was some confusion on how the functional safety standard worked in the industry. The stakeholder asked what is the risk, is it a tolerable risk, what would it take to reduce risk, if needed.
Another set of comments were provided by a stakeholder via email. A copy of the email can be found in the meeting package.
Actions from the meeting included:
- 1) NEI will consider holding workshops on NEI 17-06
- 2) NRC staff will provide all remaining comments on NEI 17-06 by December 20, 2019
- 3) During the biweekly scheduling calls, NEI and the NRC staff will discuss the need for a targeted NRC observation on a CB certification process. If such a need is determined by the NRC staff, NEI would have to facilitate this one-time observation.
Docket No. 99902028
Package: ML19240A035 Summary: ML19273A894 *concurrence via e-mail OFFICE NRR/DORL/LLPB/PM* NRR/DORL/LLPB/LA* NRO/DE/EICA/BC*
NAME JHolonich DHarrison JJohnston DATE 11/21/2019 12/30/2019 11/21/2019 OFFICE NRR/DORL/LLPB/BC NRR/DORL/LLPB/PM*