October 17, 2019 MEMORANDUM TO:

Michael D. Orenak, Acting Chief Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

G. Edward Miller, Project Manager /RA/

Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF SEPTEMBER 27, 2019, PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE REGARDING CHANGE CONTROL PROCESS FOR NEWLY DEVELOPED METHODS On September 27, 2019, the U.S. Nuclear Regulatory Commission (NRC) staff held a public meeting1 with representatives from the Nuclear Energy Institute (NEI). The purpose of the meeting was to discuss the path forward for developing and issuing Revision 3 to Regulatory Guide (RG) 1.200, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment [(PRA)] Results for Risk-Informed Activities.

During the meeting, the NRC staff discussed current status of the revision to the RG with a focus on how it would support NEI 17-07, Performance of PRA Peer Reviews Using the ASME/ANS [American Society for Mechanical Engineers/American Nuclear Society] PRA Standard, and joint efforts to revise Technical Specifications Task Force (TSTF) Traveler TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, to allow usage of newly developed methods using an NRC-endorsed process.2 Additionally, the NRC staff presented an overall summary of the schedule and path forward for revision of the RG.3 1 The original meeting notice is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML19255G073.

2 The NRC slides are available under ADAMS Accession No. ML19270H448.

3 The NRC slides are available under ADAMS Accession No. ML19270E740.

No regulatory decisions were made in the meeting.

Following the discussion, an opportunity was afforded to any other participants who wished to ask questions or make comments. No questions or comments were received from the public.

Enclosure:

List of Attendees

ENCLOSURE LIST OF ATTENDEES

Sign In Sheet DATE: Sept 27, 2019 Name Public Meeting to discuss RG 1.200 Organization

ML19273A017

  • via e-mail OFFICE NRR/DORL/LSPB/PM NRR/DORL/LSPB/LA NRR/DRA/APLA/BC NAME GEMiller JBurkhardt SRosenberg DATE 9/30/19 9/30/19 10/04/19 OFFICE NRR/DORL/LSPB/BC NRR/DORL/LSPB/PM NAME MOrenak GEMiller DATE 10/17/19 10/17/19