Discusses 800220 & 21 Site Visit W/Detroit District & North Central Div Corps of Engineers to Familiarize Reviewers W/Site.Next Meeting Scheduled for 800310 in Urbana,Il
ML19271A592
Person / Time
Site: Bailly
Issue date: 03/06/1980
From: Thompson O
Office of Nuclear Reactor Regulation
To: Rolonda Jackson
Office of Nuclear Reactor Regulation
References
NUDOCS 8003250884
Download: ML19271A592 (4)


Text

,

m w.

m En 4

t 0 1989 R!Gil.ATORY }005 F.".E COPY l

MEMORAtl0UM FOR:

Robert E. Jackson, Chief Geosciences Branch, DSS l

THRU:

Lyman W. Heller, Leader Geotechnical Engineering Section Geosciences Branch, DSS FROM:

^

Owen 0. Thompson, Geotechnical Engineer Geotechnical Engineering Section Geosciences-Branch, DSS

SUBJECT:

SITE-VISIT TO BAILLY WITH COE DETROIT PLANT NAME: Bailly fluclear 1 i

r L1CENSIriG STAGE: Post CP l

DOCKET NUMBER: 50-367 TAC NUMBER: 4764 I

r\\

)

t i

l1ILESTONE fU:'BER: R-18 RESP 0 :SIBLE CRAl:CH: LWR-4; :1 D. Lynch, LP't REVIEW STATUS: Awaiting COE review coments I

On February 20 and 21, I visited the Bailly site with M. D. Lynch, Project l

Manager, DPM, and representatives from the Corps of Engineers (COE) Detroit District and North Central Division. The licensee and his consultants l

also were present. The attendance list is attached.

l The purpose of the visit was to enable the COE staff to become familiar I

with the site since the COE has assigned different reviewers to the Bailly i

project since the site visit on flovember 26, 1979.

l The licensee presented a sumary of the design and construction history. We were conducted on a tour of the excavation and we viewed the present site conditions. The excavation was muddy and icy. The tops of piles were visible as follows:

a) all production piles (numbering about 1000 piles) in the turbine building area b) the piles installed for the indicator pile poogram, numbering.about 130 piles c) the 40-pile cluster for pile heave evaluations d) dca3ificatic, pil:s in thc.iciciit, GT tE5: si ee : '..

,; jattir.;
s a:U.

'.5.0...fff.

B..G. 0.3..;

e....

o.ts k NEC PORM 318 (b76) NRCM 0240

  • u.s **ve=a sene

..eine one.ca a e e es - se e - e s e

MAR o g g

+

a

!qD l

We inspected some of the piles which had been pulled after field. testing.

fio visible damage was observed. The licensee pointed out the five general areas (Area A through E) where jetting had caused disturbance. Although the dewatering system has not operated for many months, there was no indication of failure of the excavation slopes.

The remainder of the meeting with the licensee was confined to technical questions from the fiRC and COE staff clarifying factual information.

We held a caucus with the COE staff and discussed the review milestones and schedules. The COE reminded us that a reviewer from Waterways Experinent Station (WES) for seismic design had not yet been assigned to the project.

We suggested that the COE start by reviewing the items outlined in "Index to Current Design Information" Attachment B to tiipsco letter dated October I

16, 1979 (R. Bohn to W. Lawhead) except item 25 (Seismic Analysis and Soil Structure Interaction Analysis). Additional technical expertise needed for further review (such as item 25) could be obtained later if needed. A copy of the referenced items is attached to this memo.

The following subtasks and s2hedules sere agreed to, contingent upon the impact of the review schedule for Midland:

f 1.

(a) Review and evaluate geotechnical engineering items 1 through 29 of Attachment B (except item 25) regarding plant pile foundations in accordance with acceptance criteria outlined in the related Standard Review Plans.

Sumarize, in a draft list, those design and construction details which were reviewed, identifying each as acceptable or not acceptable.

In the later case, identify the unresolved issues and either draft positions or draft questions which will lead to resolution of these issues.

Completion date: March 7, 1980 f

l (b) Meet with the GSB and SEB staff and consultants (fiewmark, Hall, Davisson Beachum, et al) and discuss the draft lists, positions and questions derived in subtask 1 (a). Comoletion date: As soon after March 7,1980 as a meeting can be scheduled (now setffor March 10, 1980 as indicated below).

(c) h solidate the results of. subtasks 1(a) and 1(b) into a letter report identifying the items reviewed, COE staff positions, questions and fecomendations on course (s) of action to be taken during construction to resolve any outstanding issues. Completion date: within 2 to 6 weeks of completion of subtask 1(b).

~

m.c = >

.mav navan NRC POR.M 318 (9 76) NRCM 0240 k u.

    • weaaaaaar **'aveae ***,cs : i e r s. es s - ree 1

m m

g 6 Logg

~ (d) fieet with the NRC staff and the applicant to discuss the letter report from subtask 1(c), revise the letter report if necessary. Completion date:

Not specified; however, the applicant was i:1forned that within 4 to 8 weeks (March 21 to April 18,1980) we would attempt to have oubtask 1(d) complete; subsequent approval from the NRC for continuation of pile, driving was l

estimated to require an additional 4 weeks.

i 2.

Review and evaluate all geotechnical engineering aspects of the proposed phnt as outlined in subtasks 9 through 5 of Interagency Agreement tio.

{

iiRt 79-167, Task 2 - Bailly Generating Station Nuclear 1.

Conpletion i

Da.es:

In accordance with the time allocations specified in the agreement;

'ETFincurrs approximately 41/2 month slip in schedule.

We informed the COE that we would schedule a meeting with SEB and NRC consultants.

i This meeting has now been scheduled for March 10, 1980, at 9:00 a.m. in Urbana,

. Illinois.

[M DISTRIBUTION:

DOCKET FILE (50-367)_

GSB RDG Owen 0. Thompson, Geotechnical Engineer Geotechnical Engineering Section Geosciences Branch, DSS I

Attachment:

e

~

As st'ated cc: w/ attachment J. Knight L. Rubenstein l

0. Lynch L. Heller
0. Thompson J. Kane N. Gehring, COE Detroit i

t DSS,g

, DSS:GSB

-c=,

0 Thompson,:sb _LHe11efh,,,,,,,,,,,,,

aan >...315180..

. 3/hl.BQ.,

xac romu sis <,.763 unos o24o

e SEP MEETIflG Attendance T. A. Nelson LLL K. N. Jabbrar f4RC/ DOR, SEPB M. E. flit.:el EG&G Idaho W. J. Hall fl. M. flewmark R. P. Kennedy Structural Mechanics Associates R. C. Murray LLL C. H. Hofmayer flRC/ DOR /SEPB F. J. Tokarz LLL Pei-Ying Chen NRC/ DOR / Seismic Review Group

5. M. Ma EG&G San Rainon Tom fl. C. Tsai flCT Engineering D. A. Wesley Structural Mechanics Assoc.

H. W. Lee fiRC/ DOR /SEPB J. T. Greeves fiRC/ DSS /GSB T. M. Cheng NRC/ DOR /SEPB H. Levin flRC/00R/SEPB 8

[

.