ML19270H737

From kanterella
Jump to navigation Jump to search
Forwards Topical Rept Evaluation of Amend 5 to GA-A13010A, Reflecting Organizational Changes,Commitments to Latest Reg Guides & Editorial Changes
ML19270H737
Person / Time
Issue date: 12/13/1979
From: Haass W
Office of Nuclear Reactor Regulation
To: Fisher C
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
Shared Package
ML19270H738 List:
References
NUDOCS 8001030030
Download: ML19270H737 (2)


Text

-

Cr. File

53:ing File M. PDR LpDR t; SIC EC ' 0 373 DSkovholt, OPM JConway, QAB JGilray, QAB WHaass, QAB SBryan, IE i:r. Colin Fisher, P.anager Large HTGR Licensing Gensral Atocic Com any P.O. Box 31508 San Diego, CA 92133

Dear Mr. Fisher:

SU3 JECT: ilRC ACCEPTA1CE OF A! ELIDED GE!;ERAL ATOMIC QUALITY ASSUPJJiCE TOPICAL REPORT 15, 1979, submitted Aman 6ent 5 to General The Gregory /Conway letter of October Atcmic's topical report. GA-A13310A, "Ger.eral Atomic Qualtty Assurance Fregram,"

for staff review and approval.. Amendment 5 revises the topical report to reflect organi: tional changes, commit 2nts to the latest regulatory guides, and editcral CT.ang es.

Based on our review and evaluation of Amendment 5, we find that all applicable require =2nts of Appendix B to 10 CFR, Part 50, are included in the QA progr m Therefore, ycur amended topical report is acceptable, and you requi rements.

"e do not intend to repeat may inplenant it upon issuance of the amentent.

our review of this topical report when it is referenced in an applicaticn.

To use the G:neral Atonic Topical report in future license applications, cppli-cants need only referen:e this topical report in Section 17.1 of the Safety In addition, this QA program may be impleented imediately Analysis Report.

In this regard, identify in your transmittal letter on all ongoing activities.

those existing contracts that will be covered by Amentent 5 to GA-A13010A.

Should r:gulatory criteria or regulations changa such that our conclusions about You will be given the this tcpical report are invalidated, we will notify you.

oppcrtunity to revise and resubmit it should you so desire. Programatic changes by General Atomic to this topical report are to be submitted to tiRC fcr review

~

Organizational changes are to be submitted no later prior to iglementation.

than 30 days after announcement.

Fler.se replace our letter of ;cvmber 2,1970, and its enclosure, which was the st:ff's evaluation of the repcrt through Amandent 4, with a copy of this letter and the enclcsed topical report evaluation in your report, renumber the report 2A-A13010A, A e& ant 5, and resubmit 35 copies of the amandnent to the t'RC.

)b 0 _

i 0 3'CE h.

t. = *.e t h O A

  • E k..

h23M9 0%

30 E4?. E.* :: v.T c.; ; F r ic E :

e "2

8001030 a r e t ; *. ::3 s-r

  • 2 0. g:43

u h:ve :ny questiens re::rding our review or if vs can previde S h::'. :

assisunce, piet.se feel free to cont:ct !!r. Jess Cen. ay on (301) 492-7741.

Sincerely.

Original signed by Walter P. Haass

  • lalter P. liaass, Chief Quality fasurance Branch Division of Project l'anagement

Enclosure:

Topical Report Evaluation 1678 095 l

s A

err.cc)

DP !',:QAB.

.,0pidpB

'. DPM/Q/iE.~/Xl.

\\

e

s. a..... g JConviay:nb / JGilrby..

' Haas:-

.y

,g

- c k.12/../79 12/ l {. /79 12//_J,79

- =, c.,_.

..:e c.,. m. =. _.

c, m. m m

.