f e
fM Consumers R( f POW 8r V#
Stephen H. Howell gg. g Senior Vice IvesiJco.t General Of fices: 1945 West Parnall Road, Jackson, Michigan 49201. (517) 78S-0453 June 20, 1979 Hove-173-79 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Huclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAI D UUCLEAR PIET -
UNIT E0 1p DOCYET UO 50-329 UNIT MO 2, LOCIET UO 50-330 FAIR C0!; TROL PldEL, STATUS DISPLAY PAIEL MODULES In accordance with the requirements of 10 CFR 50 55(c), this letter constitutes on interic report on the status of discrepancies found in soldered components of the J201 Main Control Panel supplied 11 Msgnetics.
The attachments to this letter provide a description of the discrepancy, potential safety icplications, investigation and plcnned corrective actions.
Another report, either interim er final, vill be sent on or before July 20, 1979 P
^
i J-tMk Attachtents:
1.
Quality Assurance Program, Manegement Corrective Action Report, MCAR-1, Report 28, Revision 2, dated June 1+,1979 2.
MCAR-28, Interim Report #1, dated June 7, 1979 CC: Director of Office of Insucction and Enforcement Att: Mr John G Davis, Acting Director, USNRC (15)
Director of Office of Management Information and Program Control, U3RRC (1) 2348 045 7906220 S f3 J
OUALITY ASSURANCE PROGRAM H " -173-79 MANAGEMENT CORRECTIVE ACTION REPORT MCAR-1 REPORT NO.28 Rev. 2 6/04/79 Rev. 1 S/22/79 JOBNO.
7220 O NO.
5.031 DATE Rev. 0 5/11/79 1
- DESCRIPTION (including references):
NCR 2176 was written 5/11/79 to identify a prob 1cm with the Main Control Panel, Control Panel Section IC14 furnished by Magnetics on P. O. 7220-J-201 Revision 6.
Five (5) wire terminations (on the Status Display Panel Module) were found to be loose from their soldered connection to the individual switches as follows:
See Sheet 2
' RECOMMENDED ACTION (Optional) 1.
Determine what effect the loose wires could have on Plant safety if uncorrected. b 2.
Inspect all other cocicnents by Magnetics for this chbracteristic (100%).
d 3.
Determine why the Magnetics Quality Assurance Program and Bechtel Procurecent Supplier Quality Program did not detect this discrepant material.
Continued on Sheet 2 REFERRED TO E9 ENGINEERING O CONSTRUCTION OOA MANAGEMENT O
El PROCUREMENT ISSUED BY M}{f4 6/4/79 A
gg@ ^("f"*'
il REPORTABLE DEFICIENCY Client reported this item 90TIFIED CLIENT 5/11/79 I
! o the !!RC 5/29/79.
C D32' t
O NO Q YES
~7A Proicct Manager Dat l!!
CAUSE T5F@[i%$ra ;.QC i
CORRECTIVE ACTION TAKEN
.f 2348 046l' aun 7 W3 g,qtu A a m E E AUTHORIZED BY Date STANDARD DISTRIBUTION ADDmONAL DISTRIBUTION AS APPROPRIATE FORMAL REPORT TO CLIENT OR [oA $"o
'EGICi <Y"r7n'"
(If Section 11 Applies)
Date CPO CA MANAGER AAQ N;OCUn[U1 NT NPPIIIR QUAUTY MGR L APO OA M AN ACI R CONS 1HtK. ION MAAGE R AAO OA MANAGE R FTtOJ ::191 PH1J CCMTR MANAGER PAOJECT MANAGE R CHilF CONOIR OC t P&.1f R
$"bCr en auoNs urn AGt R 72N ewet er NT uc.R CORRECTIVE ACTION IMPLEMENTED OF t f R G D!v H J 17
.R AAO MGR OF CONSTRUClDN VERIFIED BY
- o. wee m io.ce :=o i.e.* i..cn..w. ace exument ProjoC1 OA Engineer Dato