Forwards Revised Corrective Action Section to 790510 Final Deficiency Rept Re Failure of Control Loop Bistable on Loss of Power
ML19270G450
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/31/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19270G451 List:
References
NCR-MEB-79-10, NUDOCS 7906080275
Download: ML19270G450 (1)


Text

- p TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 374ot 500C Chestnut Street Tower II MM 31 1979 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Gaorgia 30303

Dear Mr. O'Reilly:

SEQU0YAH NUCLEAR PLANT UNITS 1 AND 2 - CONTROL LOOP BISTABLES FAIL TO UNDESIRABLE POSITION ON LOSS OF POWER - NCR MES 79-10 REVISED FINAL REPORT The subject deficiency was initially reported to NRC-0IE Inspector Mike Gouge on February 14, 1979. An interim report was submitted on March 14, 1979, and a final report was sent May 10, 1979.

We have determined that the May 10, 1979, report which stated in the corrective action section that the wiring to the bistables had been corrected is in error. The enclosed report contains a revised cor-rective action section specifying that the wiring diagrams for the bistables have been corrected, and the physical wiring correctiona for each unit will be completed before its respective fuel load date.

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 354-2581.

Very truly yours, J. E. Gilleland Assistant Manager of Power m.nclosure ec: Mr. John G. Davis, Acting Director (Enclosure)!

Office of Inspection and Enforcement U.S. Nuclear Regulatory Co= mission cg ,j .,f) [ l8f Washington, DC 20555 o Ol$

7900080.2 76 ^ " ' * * " " * *"