ML19270G385

From kanterella
Jump to navigation Jump to search
Forwards LER 79-009/01T-0
Date released: 10/11/2019 Download: ML19270G385


LER 79-009/01T-0 on 790510:during Hydrostatic Test of Fire Water Sys,Compression Fitting Failed.Caused by Broken Flange.Flange Replaced
ML19270G386
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/23/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19270G386 (2)
Forwards LER 79-009/01T-0
ML19270G384
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/23/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19270G384 (1)