ML19270G007

From kanterella
Jump to navigation Jump to search
Advises ASLB That Dairyland Power Cooperative Recently Finalized One Time Only Arrangement W/Ge to Ship 18 Spent Fuel Assemblies to Morris,Il Facility for Storage Pending Completion of Proceeding.Certificate of Svc Encl
ML19270G007
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/08/1979
From: Hiestand O
MORGAN, LEWIS & BOCKIUS
To: Anderson G, Bechheofer C, Decker R
AFFILIATION NOT ASSIGNED, Atomic Safety and Licensing Board Panel, WASHINGTON, UNIV. OF, SEATTLE, WA
References
NUDOCS 7904090342
Download: ML19270G007 (4)


Text

I MORGAN, lewis & BOCKlUS Ccu ssc_cas AT LAW 18oo M Srace,N.'N.

.ao.csr si... se.c cr

. 3 sou.. mo.o s '* tre

.=vcese.

ec==sesv.ai. sos

.NAS HI NGTO N, C. t. 2 0 0 3 S

... aise ea r esco ss.

e i ais se.-eaco TedP=c=Lf 202) a?2-6000

,,, g,, g 3 3,,,, g.

,,,,,,v e=%s Casse Accatss:wCALE3CCM

,3,,.y g 3,,.v.ow s st. =c=c a t a

=cw o.a. = en.oan Jo aa

....,......a

cum a.. a s...........n o s.
a.......,

..o

.......o....

..,......o......s......,,,,

s..,,,,u.-.'

h 8,1979 s

1 m

,m

.a s

Charles Bechhoefer, Esq., Chairman j.*

}

Atcmic Safety and Licensing Board g ',

i U.S. Nuclear Regulatory Cocaission

~.\\

v

,f Washington, D.C.

20555

/

./

g,.

1 Dr. George C. Anderson Y/. ~

I Department of Oceanography University of Washington Seattle, Washington 98195 Mr. Ralph S. Decker Route 4 Box 190D Cambridge, MD 21o13 Re:

Dairyland Power Cooperative (La Crosse Boiling Water Reactor)

(Spent Fuel Fool), Docket No. 50-409 Gentlemen:

This letter is to advise the Licensing Board and the parties in the above-referenced proceeding that Dairyland Power Cooperative (DPC) recently finalized a one time only arrangement with the General Electric Company (GE) to ship not more than 13 LAC 3WR spent fuel assemblies to GE's Morris, Illinois facility for storage pending the completion of this proceeding.

Such shipment and storage is permitted under the terms of DPC's and GE's existing NRC licenses.

The shipment will take olace during the next refueling outage at LAC 34R which is teitatively scheduled for ccmpletion in early May 1979.

79040003 %

MoacAn. LIwus & Secxius Page Two March 8, 1979 This arrangement with GE is an interin measure which will only enable DPC to continue operating LACBWR for approximately another eight months after the completion of the refueling and other maintenance activities scheduled for this outage.

It in no way diminishes the sense of urgency which DPC attaches to the completion of this proceeding since other events on the critical path in this proceeding (e.g.,

issuance of the SER by the NRC Staff) have also slipped to such an extent that DPC is in virtually the same position which it was in when the Prehearing Conference was held on August 17, 1978.

Then, as now, a timely decision in this proceeding approving the expansion of the LACBWR spent fuel pool in accordance with the proposed license amendment is essential in order to maintain DPC's ability to continue to discharge spent fuel from LACBWR, thereby assuring the continued avail-ability of LACBWR to assist DPC in meeting its obligations to supply reliable and economical electric service to its customers.

Sincerely,

,w..

a x O. S. Hiestand Attorney for Dairyland Power Cooperative

/mb cc:

All parties

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

Docket No. 50-409

)

Amendment to DAIRYLAND POWER COOPERATIVE

)

Provisional Operating

)

License No. DPR-45 (La Crosse Boiling Water Reactor)

)

CERTIFICATE OF SERVICE Service has on this day been effected by personal delivery or first class mail on the following persons:

Charles Bechhoefer, Esq., Chrm.

Docketing & Service Section Atomic Safety and Licensing Office of the Secretary Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Conmission Washington, D.C.

20555 Washington, D.C.

20555 Atomic Safety and Licensing Mr. Ralph S. Decker Board Panel Route 4 U.S. Nuclear Regulatory Box 190D Cocaission Cambridge, Maryland 21613 Washington, D.C.

20555 Dr. George C. Anderson Atomic Safety and Licensing Department of Oceanography Appeal Board University of Washington U.S. Nuclear ( gulatory Seattle, Washington 98195 Commission Washington, D.C.

20555

-2

^

Colleen Woodhead, Esquire Office of Executive Legal Director U.S. Nuclear Regulatory Co=nission Washington, D.C.

20555 Richard J. Goddard, Esquire Office of Executive Legal Director U.S. Nuclear Regulatory Concission Washington, D.C.

20555 Richard Shi=shak Plant Superintendent Dairyland Power Cooperative La Crosse Boiling Water Reactor Genoa, Wisconsin 54632 Fritz Schubert, Esquire Staff Attorney Dairyland Power Cooperative 2615 East Avenue, South La Crosse, Wisconsin 54601 Coulee Region Energy Coalition P. O. Box 1583 La Crosse, Wisconsin 54601

/

i I

O. S. Hiestand Dated:

March 8, 1979