ML19270F666

From kanterella
Jump to navigation Jump to search
Forwards 1978 Annual Results & Data Rept.
ML19270F666
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/26/1979
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19270F667 List:
References
NUDOCS 7903070345
Download: ML19270F666 (1)


Text

,

I "7#FClll' I Y/ISConSin EleClMC pcarn courasr 231 W. MICHIGAN, P.o. BOX 2045. MILWAUKEE, WI S3201 February 26, 1979 fir. J. G. Keppler, Director Office of Inspection and Enforcement, Region III U. S. fiUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

DOCKET l!0S. 50-266 AND 50-301 ANNUAL RESULTS AnD DATA REPORT P0lflT BEACH fiUCLEAR PLAi4T UtilTS 1 AND 2

$nclosed herewith are two copies of the Annual Results and Data Report for the Point Beach lluclear Plant Units 1 and 2 for the year 1978. This report is submitted in accordance with Technical Specification 15.6.9.1.B and contains information regarding steam generator inservice inspections, personnel occupational exposures, and a description of facility changes, tests and experiments as required pursuant to 10 CFR 50.59(b).

Very truly yours,

, i f3 Sol Burstein Executive Vice President Enclosures Copy to: Director, Office of Inspection and Enforcement

% Distribution Services Branch, DDC, ADM.

U. S. flUCLEAR REGULATORY C0i@lISSION Washington, D. C. 20555 (40 copies) k$r 790307036

-