Board Notification 84-123:forwards Info Re Westinghouse Reactor Coolant Pump (RCP) Seals.Electricite Defrance Test of Seals Similar to Westinghouse RCP Seals Showed Rapid Rise in Seal Temp & Leakage Flow Rate in Pumps W/O Seal Cooling
ML19270C884
Person / Time
Site: Indian Point, Catawba, Wolf Creek, Byron, Seabrook, Diablo Canyon, Callaway, Comanche Peak, 05000000
Issue date: 06/29/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Gilinsky, Palladino, Roberts
NRC COMMISSION (OCM)
Shared Package
ML19270C885 List:
References
TASK-AS, TASK-BN84-123 BN-84-123, NUDOCS 8407020065
Download: ML19270C884 (7)


Text

Central Files Only June 29,1984 Docket No.: 50-275/323 50-483 50-247/286 MEMORANDUM FOR:

Chairtuan Palladino Commissioner Gilinsky Commissioner Rcberts Commissioner Asselstine Commissioner Bernthal FROM:

Darrell G. Eisenhut, Director Division of Licensing

SUBJECT:

BOARD NOTIFICATION REGARDING WESTINGHOUSE REACTriR C000."1 PllMP 5EALS (BN-84-123)

In accordance with the pec:9duras for board noti.'i.:4 tion, the foliening infarration is being transmitted di.'ectly to the Commissie:

Tho appropricte boards t re beiag notified by copy cf this memtrandum.

Inis information is coplicable to Diablo Canyor,, rallavay and Indian Point 2/3 which is currently oefore the Commission.

This recent information updates the information provided in BN-84-139 and BN-84-076.

During the April 16-17, 1984 meetings with Eler.tricite DeFrance, the staff obtained information relati.g to reactor coolant pump performance with no seal cooling.

lne French tests showed a rapid ride in seal temperature end leakage flow rate.

The staff is hoping to obtain the actual test tesults.

u-aal signed by Robertlu Purgo arreli G. Eisenhut, Director Division of 1.icensing

Enclosure:

Memo Vollner to Eisenhut 6/21/84 See Next Page for cc's

]

fdb DNI'"#

D R5tark:mj DGEisenhut 1

6/^' 84 6/9 /84 e

8407020065

/;SLB FOR:

Byron - 50/454/455 (Smith, Callihan, Cole)

Catawba 413/414 (Kelly, Purdom, Foster)

Comanche Peak 445/446 (Bloch, Jordan, McCollom)

Seabrock - 50/433/434 (Hoyt, Harbour, Lue5ke)

Wolf Creek 482 (Wolfe, Anderson, Paxton)

ASLAB FOR:

Diablo Canyon 275/323 (Moore, Buck, Johnson)

Catawba 413/414 (Rosenthal, Moore, Wilber)

Wolf Creek 482 (Rosenthal, Moora) 0?E OGC SECY.9.)

ED0 ACRS (10';

BN 84-123 Branch service lists of addressees receiving material on the following dockets:

BYRON DOCKET Mr. Dennis L. Fa-ar William Kortier

. Michael Hiller, Esq.-

4 -

i'. Edward R. Crass Mr. J'ilian Hinds CATAWBA DOCKET Mr. H. B. Tucker North Carelina MPA-1 Mr. F. J. Twogood Mr. J. C. Plunkett, Jr.

Mr. Pierce K. Skinner North Carolina Electric Membership Corp.

Saluda River Electric Cooperative, Inc.

Mr. Peter K. VanDoorn Regional Administrator, Region II Spence Perry, Esq.

Mark S. Calvert, Esq.

COMANCHE PEAK DOCKET Mr. Homer C. Schmidt Mr. H. R. Rock Mr. A. T. Parker William A. Burchette, Esq.

Mr. David R. Pigott, Esq.

Mrs. Nancy H. Williams DIABLO CANYON DOCKET Mr. Malcolm H. Furbu.h Mr. Lee M. Gustafson Resident Inspector /Diablo Canyon NPS Dr. Jose Roesset Dr. Williur E. Cooper Mr. W. C. Gangloff Regional Administrator, Region V

BN 84-123 Branch service lists of addressees receiving material on the following dockets:

SEABROOK DOCKET Bruce Beckley D. Pierre G. Cameron, Jr., Esq.

Regional Administrator, Region I E. Tupper Kinder, Esq.

Resident Inspector Mr. John DeVincentis cc. A. M. Ebner Mr. Stephen D. Floyd Ms. Letty Hett Honorable Pichard E. sul tivar.

Seacoast Anti-Pollutior. League WOLF CREEK DOCKET Mr. Glenn L. Koester Mr. Nicholas A. Petrick Mr. Donald T. McPhee Resident Inspector Teri Sculley Regional Administrator, Region IV Mr. Joe Mulholland Regienal Administrator, Region III

57aps 9Y M %

UNITED STATES 8 i.

NUCLEAR REGULATORY COMMISSION 5

.f/ '<E W ASHINGTON, D. C. 20555

    • ++*

June 21,1984 MEMORANDUM FOR:

Darrell G. Eisenhut, Director Division of Licensing FROM:

Richard H. Vollmer, Director Division of Engineering

SUBJECT:

BOARD NOTIFICATION RuGARDING INFORMATION RECEIVED FROM FRENCH ON REACTOR COOLANT PUMP SEALS

References:

(1) Memo from D. Eisenhut te the Commission dated September 21, 1983, Board Notification Regarding Westinghouse Reactor Coolant Pump Seals (BN-83-139)

(2) Memo from R. Vollmer to D. Eisenhut, dated April 6,1984, Board Notification Regarding Westinghouse Reactor Coolant Pump Seah During meetings with Electricite De France (EDF) in Paris, France on April 16-17, 1984 the staf f acquired new information relating to reactor coolant pump (RCP) seal behavior as discussed in the memoranda referenced above.

EDF conducted RCP seal tests at the 900 MW pump test loop at Gennevilliers during 1983 which convinced them to backfit their plants to provide an emergency source of cooling to the RCP seals, during station blackout conditions.

The RCP seals tcsted are similar if not identical to the Westinghouse seals used in the United States.

The tests were performed with the ECP seal in a stationary configuration, subjected to full reactor coolant temperatcre and pressure, with no seal cooling.

The tests were terminated after several minutes in order to prevent damage to the pump assembly being tested.

The rapid rise in seal temperature and leakage flow rate observed during the tests convinced the French that the RCP seal cooling should not be interrupted, except for very short periods of time, during emergencies such as station blackouts.

The Gennevilliers test results also showed that with rapid temperature and flos transients the number one stage of the RCP seal would open.

Based on information received from the French and on a recent RES trip report, it is our understanding that the French are providing a steam turbine driven pump to supply ems rgency cooling for the RCP seals in their smaller plants.

In the larger plants they are providing a steam turbine driven generator as a source of emergency power to an existing pump to supply the RCP seal cooling.

In addition, a backup gas turbine generator will be installed at each four unit plant site to provide another level of emergency electrical power for cooling the RCP seals.

s h

J

(_

Darrell G. Eisenhut June 21, 1984 Although the actual test results have not been made available to us at this time, we believe that this additional information should be provided as an update to the. referenced board notification.

&/}/>,- %

' Richard H. Vollmer, Director Division of Engineering cc:

H. Denton E. Case R. Vollmer D. Eisenhut R. Mattson T. Speis J. Knight V. Noonan G. Bagchi J. Jackson

Contact:

J. Jackson, NRR Ext. 27930

/