ML19269E950

From kanterella
Jump to navigation Jump to search
Requests Changes to Certificate of Compliance 9111 & 9113. Changes Involve Replacement of Threaded Studs W/Bolts. Drawings BC-20-200D & BA-20-200D Encl
ML19269E950
Person / Time
Site: 07109111, 07109113
Issue date: 06/29/1979
From: James Corbett
CHEM-NUCLEAR SYSTEMS, INC.
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19269E951 List:
References
NUDOCS 7908140475
Download: ML19269E950 (2)


Text

..

W1 hk CHEM-NUCLEAR SYSTEMS INC.

e P.O. Box 1866 + Beuevue, Washington 98009 e (206) 827 0711 p

June 29,1979 Mr. Charles E. MacDonald Transportation Branch Division of Fuel Cycle and Material Safety U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Refereace:

Dockets 71-9111 an 71-9113

Dear Mr. MacDonald:

We respectfully request administrative changes to certificates of compliance numbers U.S.A./9117A dated June 29, 1978 and U.S.A./9113/A dated May 19, 1978.

The requested changes involve the replacement of threaded studs with bolts and a number of drawing changes none of which affect the safety of the packages.

Following is a detail description of these changes.

C U.S.A./911/A - Dwg. No. BC-20-200D, Rev. / (CriSI-1-337-103)

Sheet No. 1 1

Zone B-1, Revised size of gasket from 1/2" X 2" to 1/2" X 1 7/8" to correct an interference problem. Added the primary gasket note.

2 Zone C-4, Added the location and related dimensions of the primary lid and secondary lid interior and exterior gaskets.

3 Zone C-7, Replaced studs on primary lid with 1 1/4-7 Unc S.A.E.

Grade 5 X 61/4" 19. bolts (8 places).

4 Zone C-7, Replaces studs on secondary lid with 1-8 Unc S.A.E.,

Grade 5 X 2 1/4" 1. bolts (8 places).

9 5

Zone C-6, Added degrees and dimensions of bolt circles.

Sheet No. 2 1

Zone D-8, Added Callout for the secondary lid interior and exterior gaskets.

2164 134 U.S.A./9113/A - Dwg. fio. BA-20-200D (CNSI-1-338-101) 5heet No. 1 790814 0 /-/ 7 b~

C 1

Zone D-1, Removed optional detail A which is not required, 23r23

2 correct detail A shown in Zone D-3.

1 2

Zone C-1 Added "See Detail - L, sheet 2" callout for gasket detail.

Added callout - Drill and tap 3/4-10 Unc X 1" D.P.

Replaced studs with 3/4-10 Unc, S.A.E. Grade 5 X 21/4"

19. bolts.

3 Zone D-4, Added callout "See Detail K sheet 2" callout for gasket detail.

4 Zone B-3, Removed Shield model 7-100-1 and related dimeasion which do not apply.

5 Zone B-6, Replaced stud callout with "Hx Hd Bolt".

6 Zone C-6, Replaced center lifting lug with three lugs 120 apart at 6" radius.

7 Zone C-3, Corrected Detail B to reflect as - built condition.

Sheet No. 2 1

Zone B-4, Added gasket Detail K and material callout.

2 Zone B-5, Added gasket Detail L and material callout.

3 Zone A-4, Relocated Detail G-G from Zone B-5.

4 Zone D-2, Corrected Detail B to reflect as built condition.

Some of our customers have questioned condition 5(b)(1). Would you please add the words, " Greater than Type A quantities of byproduct material contained in --- " to Conditions 5(b)(1) and 5(b)(ii).

Our check in the amount of $ 300.00 is enclosed for the two amendments.

Please contact this office if you have any questions.

Sincerely,

',,b'$Eu w $ &

J. Stewart Corbett, Mgr.

Licensing and Safety 2164 135 13ma