B&W Site Inspector Daily Rept on 790409.Plant Status:Reactor in Mode 5 Cold Shutdown Maint Outage.Revision to Procedures Expected to Be Completed 790410
ML19269E438
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/09/1979
From: James Smith, Tambling T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19269E434 List:
References
FOIA-79-98 TI-2595-2, NUDOCS 7906290044
Download: ML19269E438 (1)


Text

'

N

,-7 0FFICE OF INSPECTTON AN1) ENFORCMENT 14W SITE INSPECTOR DAILY REPORT Davic-Dcosc Unit 1 (50-346)

.Date April 9, 1979

^

Tuepector(u)*

T. Tumbling

,E J. Smith hit

.G General Plant Status: Mode 5 (Cnid Shutdown) M.tlatenance cutage.

~

1.

Summary or Licensee Response to IE Sulletin 79-05 and supplements:

a.

Review cf Similar Transients (item 2 of IES79-05A):

1.icansce states that their review of tranntents is essentially complete. At thin point they saa no now information not x 1

  • andy developed via the TM1-2 event.

b.

Review and Revision of Operating and Maintensuce Procedures (Items 3, 4, 5, 7, 8, 9, 10 of IEB 79-05A'):

Revision to procedures is in progrese.. licensee expects to have job done by April 10, 1979.

!hsergency, Administrative and Maintenance. procaduren are being.revisad.

A major Change will be key control of ESY valves which was initiated prior Lu the TMI-2 evuut.

t:.

Review and Imple.muntation of Changes in Containment Tsnlation (Irem 6 1ED /9-05A):

No changn in status; ref erence report of AprH 7,1979.

d.

Tretining of Plant Pervounel (Itums 1, '4,11 and plant / procedures changas):

No change in status; reference t. dr' :

.'gr'.1 7, 1979.

2136 050 790629069L ll

.P d4

.