ML19269E145

From kanterella
Jump to navigation Jump to search
Requests Replacement of Cover Sheet for Insp Rept. Changes Rept Number from 70-1257/79-01 to 70-1257/79-04.Also Requests Corresponding Mod to Which Forwarded Rept
ML19269E145
Person / Time
Site: Framatome ANP Richland
Issue date: 05/18/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
NUDOCS 7906260576
Download: ML19269E145 (2)


Text

.

PDL UNITED STATES y~

y *.

NUCLEAR REGULATORY COMMl3SION f,..

j REC 10N V SulTE 202. WALNUT CREEK PLAZ A O

sk 1990 N. C ALIFORNI A BOULEVARf)

,o 9

W ALNUT CREEK. CALIFORNI A 94!96

  • e,e*

May 18,1979

SUBJECT:

EXXON NUCLEAR COMPANY DOCKET NO. 70-1257 Please replace the cover sheet you now have to the subject report with the attached. The report number has been changed frou 70-1257/79-01, to 70-1257/79-04.

Also, please correct the second page of the letter to Exxon dated March 16,1979 transmitting the report to reflect the new 04 report number rather than 0.

F Thank you.

Fuel Facility and Materials Fr Safety Branch l

a i

I i

l.

2133 357 7906260 7 7g C

.?Rg

~

IDIi U. S. fDJCLEAR REGULATORY COMMISSION OFFICE OF lilSPECT10l1 AND ENFORCEMENT REGION V Report No. 70-1257/79- 04 I

Docket No. 70-1257

_ license No. SfN-1227 Safeguards Group Exxon Nuclear Company Licensee:

2101 Horn Rapids Road Richland, Washington 99352 Richland Facility Facility Name:

Richland, W'ashington Inspection at:

Feb'ruary 12-16, 1979 Inspection Conducted:

.?bb' l 9. 6b;

]/p/77 Inspectors:

~ Date Signed W. J. Cooley,v' Fuel F'acilities Inspector

.!I1 && /,J

.$/77 Date Signed P.R.ZurakowsljilRadiationSpecialist

[. f/ /t-J 4/,79 wy Approved By:

Eate' Signed

- g H. E. Book, Chief, Fuel Facility and Materials Safety Branch Sumary:

Inspection on February 12-16,1979 (Report No. 70-1257/79-01)

Organization; modifications and changes to facilities and Areas Inspected _:

systems; internal review and audit; safety committee activities; employee training programs; preventive maintenance / calibrations; operations review; criticality safety; emergency planning / fire protection; radiation protection; The inspection involved 58 inspector-hours and confimatory measurements.

onsite by two inspectors.

No it, n of noncompliance or deviations were identified.

Results:

/

IE:V Form 219 (2 2133.358

.. -