ML19269D863

From kanterella
Jump to navigation Jump to search
Forwards Requalification Program for GE Nuclear Test Reactor as Part of Request for Renewal Application for License R-33
ML19269D863
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 06/13/1979
From: Darmitzel R
GENERAL ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19269D864 List:
References
NUDOCS 7906200236
Download: ML19269D863 (2)


Text

..

GENER AL h ELECTRIC

" * " ^ " " " " " "

ENGINEERING GENERAL ELECTRIC COMPANY. P.O. 3OX 403, PLEASANTON, CALIFORNIA 94566 DIVISION June 13, 1979 Mr. H. R. Denton Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C., 20555 Attention:

Operating Reactors Branch 4

SUBJECT:

Nuclear Jest Reactor License Renewal

Reference:

License R-33, Docket 50-73 Gentlemen:

The General Electric Company, Vallecitos Nuclear Center (VNC), currently operates the General Electric Nuclear Test Reactor (NTR) pursuant to License R-33 (Ref.). As this license expires on July 21, 1979, General Electric requests that License R-33 be renewed until October 31, 1997.

This date was chosen as the original license was issued on October 31, 1957, and this extension period will complete the normal forty-year term of a reactor license.

RENEWAL APPLICATION INFORMATION I.

Site Licenses e

The following licenses have been issued for the VNC site:

R-33 (Docket 50-73), TR-1 (Docket 50-70), DPR-1 (Docket 50-18), DR-10 (Docket 50-183),

SNM-960 (Docket 70-7E4), and 0017-59 (State of California).

II.

Financial Informatio].

Financial informatien will be fomarded under separate conr.

Ff W g.Jee A check for $20,000'.'%as reouiend by lnrFR170.77 IV.

Envi ronment t Appraisal (EIA) Information EIA infonnation will he fomarded under separate cover.

h ktf')

2251 072 0906200t %

Mr. H. R. Denton June 13, 1979 _.

V.

Safety Analysis Report (SAR)

The SAR will. be forwarded under separate cover.

t Emergency Nans Copies of th tewide VNC emergency plan are enclosed.

The basic plan was appr for at the General Electric Test Reactor on 7/1/76.

VII.

Technical Specifications The Technical Specifications will be forwarded with the SAR.

Q III Operator Licenses and Requalification Training Program

/

Operation of the Nuclear Test Reactor (NTR) is restricted to licensed operators.

Personnel currently licensed are:

Name Operator License #

M. S. Bartos S0P-2701-1 W. B. Johnson 50P-1272-4 C. E. Leighty 50P-1870-2 G. L. Smith SOP-2702-1 S. R. Thompson S0P-1873-2 H. L. Zahirniak SOP-4048-1 Enclosed are copies of the revised reactor operatNequalification tr?in-ing program.

This is a new program. NTR will continue to operate unaec j

the current program (submitted 12/7/73) pending its approval.

-Physicahurity P1v Copies of the ecurity plan are enclosed.

To the best of my knowledge and belief, the information contained herein is accurate.

hhep a-n p a.

CFF:C!Ai_ <

OY,

/

$g? }' v:RGINIA c. cm ioRo >

C R. W. Darmitzel, Manager

.y.

tmst puCUC - CF FORNIA Irradiation Processing Operation m was mom <

'A-d$ lim'd'[ % E?

Submitted and sworn before me this thirteenth day of June,1979.

g[ dot <<ga), Notary Public in and for the County of Alameda e of Cali fo'rnia, vcc 2251 073