ND-19-1153, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.19.02a (Index Number 486)

From kanterella
(Redirected from ML19269D844)
Jump to navigation Jump to search
Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.19.02a (Index Number 486)
ML19269D844
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/26/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-19-1153
Download: ML19269D844 (7)


Text

Michael J. Vox 7825 River Road

^Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tel SEP 2 6 2019 Docket Nos.: 52-025 52-026 ND-19-1153 10 CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.3.19.02a (Index Number 4861 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of September 26, 2019, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.19.02a

[Index Number 486] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed.

All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

//J.

Michael J. Vox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.19.02a [Index Number 486]

MJY/CWM/sfr

U.S. Nuclear Regulatory Commission ND-19-1153 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier(w/o enclosures)

Mr. D. H. Jones(w/o enclosures)

Mr. G. Chick Mr. M. Page Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 go:

Nuclear Regulatory Commission Mr. W. Jones (w/o enclosures)

Mr. F. D. Brown Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. V. Hall Mr. G. Armstrong Ms. T. Lamb Mr. M. Webb Mr. T. Fredette Mr. C. Weber Mr. S. Smith Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

U.S. Nuclear Regulatory Commission ND-19-1153 Page 3 of 3 Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Orlani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-19-1153 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-19-1153 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.19.02a [Index Number 486]

U.S. Nuclear Regulatory Commission ND-19-1153 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 1.a) The EPS has handsets, amplifiers, loudspeakers, and siren tone generators connected as a telephone/page system.

1.b) The EPS has sound-powered equipment connected as a system.

2.a) The EPS telephone/page system provides intrapiant, station-to-station communications and area broadcasting between the MCR and the locations listed in Table 2.3.19-1.

2.b) EPS provides sound-powered communications between the MCR,the RSW,the Division A, B, C, D do equipment rooms(Rooms 12201/12203/12205/12207), the Division A, B, C, D l&C rooms(Rooms 12301/12302/12304/12305), and the diesel generator building (Rooms 60310/60320) without external power.

Inspections/Tests/Analvses Inspection of the as-built system will be performed.

Inspection of the as-built system will be performed.

An inspection and test will be performed on the telephone/page communication equipment.

An inspection and test will be performed of the sound-powered communication equipment.

Acceptance Criteria The as-built EPS has handsets, amplifiers, loudspeakers, and siren tone generators connected as a telephone/page system.

The as-built EPS has sound-powered equipment connected as a system.

Telephone/page equipment is installed and voice transmission and reception from the MCR are accomplished.

Sound-powered equipment is installed and voice transmission and reception are accomplished.

ITAAC Completion Description This ITAAC is performed to verify, by inspection and testing, that the Communication System (EPS) is installed with handsets, amplifiers, loudspeakers, siren tone generators, and sound-powered equipment that is operating properly.

ITAAC 2.3.19.02a is completed as a combination of:

  • Pield inspections of the Plant Paging System (PPS)

U.S. Nuclear Regulatory Commission ND-19-1153 Enclosure Page 3 of 4

  • Field inspections of the Sound Powered Phones(SPP)
  • Testing of the PPS with voice transmission and reception from the Main Control Room (MCR)and other required locations throughout the plant
  • Testing of the SPP with transmission and reception between the MCR, Remote Shutdown Workstation(RSW)and other required locations throughout the plant The inspections place operators in the field at predetermined locations where PPS and SPP components are installed and verify that the necessary equipment is available. The MCR personnel initiate a communication test and each operator in the field verifies the transmission from the MCR is received. The response back from the operator in the field to the MCR verifies the reception by the MCR is received. The PPS equipment that must be verified is listed in Combined Operating License(COL)Appendix C Table 2.3.19-1 (see Attachment A). The SSP equipment that must be verified is listed in COL Appendix C ITAAC No. 2.3.19.02a Item 2.b)

(see Attachment B).

Additional tests verify the operators in the field can hear a plant page, fire alarm, and warble alarm from the PPS with a response to the MCR and other locations verifying the PPS is operating properly for these functions.

All the inspections and testing are performed using 3/4-EFS-ITPP-501 (References 1 and 2).

The completed Unit 3 and Unit 4 inspection and testing (References 1 and 2)confirm the as-built EFS has handsets, amplifiers, loudspeakers, and siren tone generators connected as a telephone/page system, the as-built EFS has sound-powered equipment connected as a system, telephone/page equipment is installed and voice transmission and reception from the MCR are accomplished, and sound-powered equipment is installed and voice transmission and reception are accomplished.

References 1 through 2 are available for NRC inspection as part of the ITAAC 2.3.19.02a Unit 3 and 4 Completion Packages (References 3 and 4).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

References(available for NRC inspection)

1. 3-EFS-ITPP-501,"Communication System (EFS) Preoperational Test"
2. 4-EFS-ITPP-501,"Communication System (EFS) Preoperational Test"
3. ITAAC 2.3.19.02a-U3-CP-Rev0,"ITAAC Completion Package"
4. ITAAC 2.3.19.02a-U4-CP-Rev0,"ITAAC Completion Package"
5. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"

U.S. Nuclear Regulatory Commission ND-19-1153 Enclosure Page 4 of4 Attachment A Telephone/Page System Equipment* Location*

Fuel Handling Area 12562 Division A, B, 0, D dc Equipment Rooms 12201/12203/12205/12207 Division A, B, C, D l&C Rooms 12301/12302/12304/12305 Maintenance Floor Staging Area 12351 Containment Maintenance Floor 11300 Containment Operating Deck 11500 Attachment 8 Sound-Powered Phone System Location Equipment Main Control Room 12401 Remote Shutdown Workstation 12303 Division A, B, C, D dc Equipment Rooms 12201/12203/12205/12207 Division A, B, C, D l&C Rooms 12301/12302/12304/12305 Diesel Generator Building 60310/60320