d,

..t KR A 4

UNITED STATES y'

f' NUCLEAR REGULATORY COMMISSION

{y

, e j

WASHINGTON, D. C. 20555 a'

( *..../

APR 2 71979 DOCKET N0.

50-599/600 APPLICANT:

COMMONWEALTH EDIS0N COMPANY - INTERNAL STAFF MEETING FACILITY:

CARROLL COUNTY STATION

SUBJECT:

SUMMARY

OF DEDICATED REVIEW TEAM MEETING HELD ON APRIL 24, 1979 An orientation meeting for the Carroll County Station Dedicated Review Team was held on April 24, 1979 in Bethesda, Maryland. The participants and members of the DRT are shown in Enclosure No.1. Attendance at the orientation session is listed in Enclosure No. 2.

All branches were represented except RSB, ICSB and OLB. These branches will be subsequently contacted.

The review of the Carroll County Station application will follow Recomendation Nos. 3, 4 & 5 of NUREG-0292, " Nuclear Power Plant Licensing:

Opportunities for Improvements" (Denton Task Force).

Implementation of these recommendations are described in PM Operating Procedure Nos. 221, 222 and 223, copies of which were provided to each DRT member. The schedule of events for our review of the Carroll County Station application are shown on Enclosure No. 3.

On April 4,1979, the staff accepted the tendered Carroll County Station application for docketing which occurred on April 5,1979. The applicant pursuant to 10 CFR 2.101, has filed documents on early consideration of site suitability issues - Early Site Review (ESR). This review is underway. The PSAR will be filed in early 1980. Pretendering activities for the PSAR will occur during the next two months. The intent of these activities is to improve the quality of the incoming PSAR by developing and maintaining good working level comunications between the staff and applicant. This comunication should provide the applicant with a clear understanding of staff requirements, enable the staff to become familiar with the proposed design and its problems, and provide positive guidance and direction during the applicant's preparation of the PSAR. The discussion with the applicant should include a " walk through" of each appropriate Standard Review Plan providing guidancgC items; ACRS and and interpretation in troublesome areas; planned revisions to SRPs; R 2258 219 7 906 040D76

.s

. gpg 2 7 3979 staff generic items; BTPs and recent open SER matters. Althcugh the pretendering meetings will not be structured, it is required that each participating Branch provide the LPM with a prepared agenda at least 15 days prior to the meeting. A pretendering meeting schedula (See Enclosure No. 4) has been developed to effectively implement our pretendering activities.

R. A. Birkel Light Water Reactors Branch No. 2 Division of Project Management

Enclosures:

1.

List of DRT Members 2.

Attendance List 3.

Schedule of Events 4.

Pretendering Meeting Schedule 2258 220 i

April 24, 1979 ENCLOSURE 1 50-599/600 CARROLL COUNTY PROJECT DEDICATED REVIEW TEAM DPM DSS DSE QAB:

F. Liederbach (QA0)

MEB:

R. Kiessel AAB:

A. Brauner F. Allenspach (T&O)

MTEB:

F. Litton (Materials)

ETSB:

W. Travers OLB:

J. Holman B. Turovlin (Metalurgy)

RAB:

C. Hinson SB:

P. O'Reilly SEB:

H. Polk LWR #1:

L. Kintner EPB #1:

C. Haupt LWR #2:

R. Birkel RSB:

R. Frahm CPB:

D. Houston (Fuel)

GB:

H. LeFevre (Geology)

11. Dunenfeld (Physics)

P. Sobel (Seismology)

AB:

G. Holahan (SRP 4.4)

0. Thompson (Foundation W. Jensen.(SRP 6.2)

Engineering)

S. Salah (SRP 15.0)

HMB:

G. Staley (Hydrology)

CSB:

W. Milstead W. Snell (Meteorology)

ASB:

W. LeFave PSB:

H. Balukjian

0. Chopra ISCB:

D. Thatcher rs)

N Cn CD N

N

a ENCLOSURE 2 AITENDANCE LIST CARROLL COUNTY STATION DEDICATED REVIEW TEAM ORIENTATION MEETING

_ APRIL 24, 1979 NRC - STAFF R. A. Birkel C. S. Hinson

0. O. Thompson M. Dean Houston J. W. Shapakar B. Milstead W. Belke A. Brauner H. E. Polk R. J. Goddard H. Balukjian
0. Chopra H. E. Lefevre G. B. Staley R. J. Kiessel R. Bosnak D. Fieno W. Haass W. R. Butler K. Kniel L. Kintner P. O' Reilly B. LeFave W. L. Jensen S. Salah B. Travers F. Litton D. Vassallo R. Baer C. Haupt
  • nul 2258 222 M. Peranich M. Dunenfeld B. Turovlin

APR 2 7 tyg ENCLOSURE 3 Schedule Of Events g5am Carroll County Nuclear Station PSAR ESR RESAR412 TOPICAL REPORTS DEMO. OF DID REQ'O BY g

IPS VERIF.

NUREG 0493 (WCAP 9500 (WACP- )

(WCAP- )

Ir 5401)

MAYUUNE 79 MAYlJUNE 79 (PRETENDERING)

(PRFTENDERING (MTGR WITH MTGR WITH@l APPLICANT)

JULY 79 (TENDER PDA)

SEPT.79 SEPT.79 USSUE DES)

(DOCKET PDA)

JAN.10 JAN.10 (ACCEPTANCE USSUE FES)

REVIEW OF PSAP)

FER '80 (ESR-FEB. '80 USSUE ASLB HR'G)

SER, WCAP S401)

JUNE '80 MAY '80 GSSUE JUNE 10 JUNE 10 (DOCKET PSAR)

SER. WCA? 9500)

USSUE SER)

' ISSUE SER)

AUG. '80 m

(DOCKET ER)

SEPT. '80 USSUE SER)

NOV. '80 (ACRS MTG)

DEC. '80 USSUE SER)

FEB. '81 FEB.11 (ACRS MTG)

USSSUE PDA)

APRIL 11 (ASLB HR'G)

DCT.11 USSUE LWA)

APRIL 12 2258 223 M,R GSSUE FDA)

APRIL 14 (TENDER FSAR)

APRIL '88 (FUEL LDAD UNIT 1)

OCT. *88 (COMMERCIAL OPERATION UNIT 1)

APRIL,1979

ENCLOSURE 4 ADD o 7 jgyd)

Docket No. 50-599/50-600 PRETENDERING MEETING SCHEDULE WITH COMMONWEALTH EU:SGN COMPANY CARROLL COUNTY NUCLEAR STATION Week Beginning NRR Branch

  • May 7, 1979 ICSB:

D. Thatcher RSB:

R. Frahm.

CPB:

D. Houston (Fuel)

M. Dunenfeld (Physics)

AB:

G. Holahan (SRP 4.4)

W. Jensen (SRP 6.2)

S. Salah (SRP 15.0)

CSB:

W. Milstead May 21, 1979 MEB:

R. Kiessel MTEB:

L. Litton (Materials)

B. Turovlin (Fetalurgy)

SEB:

H. Polk GB:

P. Sobel (Seismology)

H. LeFevre (Geology)

0. Thompson (Foundation Eigineering)

HMB:

G. Staley (Hydrology)

W. Snell (Meteorology)

June 4, 1979 AAB:

A. Brauner ETSB:

W. Travers RAB:

C. Hinson ASB:

W. LeFave PSB:

H. Balukjian

0. Chopra June 18, 1979 QAB:

F. Liederbach (QAO)

F. Allenspach (T&O)

OLB:

J. Holman

  • At a minimum each Branch shall be represented at the pretendering meeting by:

Responsible Technical Reviewer, Section Leader and Branch Chief.

2258 224