$SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830. Sacramento, California 95813; (916) 452-3211
'RJR 79-13 January 5, 1979
,9I (p
>y
[,%.[!lQ h 1
',' (' l l /9 79 g;
U. S. Nuclear Regulatory Commission
[l. c[f[,
y k g~ Y C, [f Attn:
Mr. R. H. Engelken, Director
- )
t G
'N Region V Of fice o f Inspection & Enforcement 1990 North California Boulevard Walnut Creek Plaza, Suite zJ2 Walnut Creek, CA 94596 RE: Operating License DPR-54 Docket No. 50-312 Repottable 'ccurrence 79-1
Dear Mr. Engelken:
In accordance with Technical Specifications for Rancho Seco Nuclear Generating Station, Section 6.9.4.1.b, the Sacramento Municipal Utility District is hereby reporting the following as Reportable Occurrence 79-1.
At 1307 on January 5, 1979, a reactor trip occurred simultaneous with the loss of non-nuclear instrumentation for the plant. At times during the period following the trip, the cooldown rate exceeded the maximum permissible rate stated on Figure 3.1.2-2 of the Technical S ecifications. The District and the reactor vendor (Babcock & Wilcox) p are evaluating the trip and cooldown transient, and the findings will be contained in a follow-up report to be submitted within fourteen days.
The reactor will not be returned to operation unless the findings are acceptable.
This occurrence was reported to R. Faulkenberry of your office by telephone on January 5, 1979.
Res,-
t ully submitted, D
h R. J. Rod rig, >z, Manager Nuclear Operd ons Department RJR:RWC:sik