YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-01 FOR THE MONTH OF JANUARY, 1979 7 9 0 2 2 0 0 0 4/t
OPERATING DATA REPORT 0-29 DOCKET NO.
DATE 790212 COSIPLETED BY R.M.Sjoeren TELEPl!ONE (617)166 0011 X2281 OPERATING STATUS N tes
- 1. Unit Name:
Yankee Rowe
- 2. Reporting Period:
January, 1979 600
- 3. Licensed Thermal Power t.\\lWt):
185
- 4. Nameplate Rating (Gross SIWE):
- 5. Design Electrical Rating (Net alwe):
175
- 6. Sf aximum Dependable Capacity (Gross SIWE): _ 180
- 7. Slaximum Dependable Capacity iNet 31We):
I75
- 8. If Changes Occur in Capacity Ratings tirems Number 3 Through 7) Since Last Report. Gise Reasons:
- 9. Power Lese! To which Restricted,If Any (Net.\\lWe):
- 10. Reasons For Restrictions,If Any:
This Slonth Yr..t o.Da t e Cumulative 744 744
- 11. Ilours In Reporting Period I I'9 0*7
- 12. Number OfIlours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown llours
- 14. Ilours Generator On-Line 733.8 733.8 127,611.8
- 15. Unit Reserve Shutdown flours 0
0 0
- 16. Gross Thermal Energy Generated (31Wil) 421,572 421,572 67,995,117.11
- 17. Gross Electrical Enargy Generated (51Wii) 134,758 4,
134,758.4 20,895,706.4
- 18. Net Electrical Energy Generated talWII) 126,643.5 126,643.5 19,560,524.9 96.6 98.6 79.9
- 19. Unit Service Factor
- 20. Unit Asailability Factor 98.6 98.6 79.9
- 21. Unit Capacity Factor (Using.\\lDC Net) 97.3 97.3 72.5 97.3 97.3 72.5
- 22. Unit Capacity Factor (Using DER Net) 1.4 1.4 1.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6.\\lonths (Type. Date,and Duration of Each):
Maintenance Shutdown February 24, 1979 for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY Coil.\\lERCIAL OPER ATION (9/77)
AVERAGE DAILY UNIT POWER LEVEL 50-29 DOCKET NO.
UNIT Yankee Rowe D ATE 790212 C0\\lPLETED BY R.M.
Slocren TELEPliONE(617) 366-9011 X2281 510NT11 January, 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAll.Y 90WER L EVEL (51We Net)
(51We-Net )
166.6 174.9 y
,7 168.1 174.9 y
33 3
174.4 19 174.7 4
17, e 20 174.9 174.7 175.0 5
21 174.8 77.2 6
22 175.0 7
23 146.2 174 9 24 172.7 8
174.9 174.7 9
25 174.9 174.0 10 26 174.9 gg 27 1 74.9 174*9 174.9 12 2S 174.9 174.8 13
,9 175.0 30 174.9 174.9 15 31 16 174.9 INSTRUCTIONS On this format, list the average daily unit power lesel in SlWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 9
50 ?9 UNITSilU1 DOWNS AND POWER REDUCTIONS DOCK ET NO.
Iankee Rowe UNIT N AM E DATE 70n,1, REPORT MONTil J nuary,_ 1979 COMI'L E El Y X2281 I
e.
e c
.5 E
}
$YQ Licensee
,E -r
{'a Cause & Corrective o
o No.
Date g
3 Ej
,3 g 5 Event Fg el Action in
$E 5
3 (5 c Repor t **
LE U SU Prevent itecurrence H
e
- 5 u
l' 1/22/79 F
10.2 A
Turbine contro1 valve NO. 2 t urbin' Auto-servo motor oscillated during contro matic low power-to be fixed during system Scram Feb. 24th S/0
( scill a-t ions 1
2 2
4 11 Finted Iteason:
Me tho11:
Exinbii G. Instructions S. Stheduled A Eiluipment Failure (Explain) 1 Manual for Picp.iration of Data ll Maintenance or Test 7 Manual Serain.
Entry Shecis for 1.ieensee C-Itclucting 3-Automatic Scrain.
Event IteporI (Llitti File INUllEG-D.Itegulatory itestiiction 4-Other (Explain) 0161)
ILOpciator liaining,1 License Examination F-Aih ni ni,t u s ive 5
G Opceational I e sor (1:.xpl.on)
Exluhit !- Same Sonsce 08/17)
II Othes (lixplain)
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 790212 COMPLETED BY R.M. Sjogren TELEPHONE (617) 366-90ll X2281 REPORT MONTH January, 1979 SUM:!ARY OF OPERATING EXPERIENC S, 1/22 At 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> commencea load reduction for throttle and control valve exercises. At 1055 hours0.0122 days <br />0.293 hours <br />0.00174 weeks <br />4.014275e-4 months <br /> a reactor scram occurred due to low main coolant system pressure. At 2008 hours0.0232 days <br />0.558 hours <br />0.00332 weeks <br />7.64044e-4 months <br /> the reactor was b rought critical. At 2109 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.024745e-4 months <br /> the generator was phased on the line. A hold was necassary at 30 >Ne to allow steam generator chloride concentration to return to normal.
1/23 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> steam generator chloride concentration was reduced to
< 0.5 ppa and load increase was begun. At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> load was held at 182 MWe to allow xenon to reach equilibrium.
1/24 At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> load increase began and at 1145 full load was reached.
8gn arc,%o g
o UNITED STATES 37, NUCLEAR REGULATORY COMMISSION
)
5
' '$' 9 l WASHINGTON, D. C. 20555 j
'of. is.3 ['l,}
3, MEMCRANDUM ?CR: TERA Corp.
FRCM:
US NRC/T DC/ Distribution Services 3 ranch SU3 JECT:
Special Document Handling Requirements
/
b 1.
Please use the fo].lcuing special distribution list for the attached doct: ment.
See ArrAced 2.
The attached doc:= lent requires the following special considerations:
O Do not send overs 1=e e= closure to the NRC PDR.
Caly one oversi e enclosure was received - please return for Regulatory File storage.
Propriatary infernation - send affidavit only :o the NRC ?DR O other: (svec117)
I Nb
- DS3 Files TCC/DS3 Authorized Si.gna:ure
-.. - -