ML19269B851

From kanterella
Jump to navigation Jump to search
Notice of Rescheduled Meeting W/Ga Power Co to Obtain NRC Concurrence on Preliminary Design Concept for Mod of Reactor Protection Sys Power Supply.New Date 790110
ML19269B851
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/28/1978
From: Verrelli D
Office of Nuclear Reactor Regulation
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 7901170283
Download: ML19269B851 (2)


Text

UNITED ST ATES

[

NUCLEAR REGULATORY COMMisslON

_, (--y j

W ASHINGTON, D. C. 20555

( '*.....,,/ I December 28, 1978 Docket tios. 50-321 and 50-366 MEI'OPX;DUM FOR:

Thomas A. Ippolito, Chief, ORB #3, 00R FROM:

D. M. Verrelli, Pr,oject Manager, ORB #3, 00R

SUBJECT:

FORTHCOMING MEETING WITH GEORGIA POWER COMPANY YebstLNog >

N fs b W Date:

T"

t., :..

Time:

C.::

L 00 7. M -

.s....

Purpose:

To obtain Commission concurrence on preliminary design concept for modification of Hatch RPS Power Supply Location:

P-500

Participants:

Georgia Power Company J. Betzel, et al NRC T-~ Rosa, D. Tondi, J. T. Beard, D. Verre11i, T. Ippolito 60-Da d M. Ver elli, Project Manager 0p rating actors Branch #3 Division of Operating Reactors s

\\

v

~

d 790117oMr3

MEET!f!G f;0TICE DISTRIBUTIOi!

[h[

Docket Files ge r:; se N'

Local PDR ORS #3 Rdg fiRR Rdg EGCase VStello BGrimes DEisenhut HDenton TIppolito RReid GKnighton DDavis PCheck GLainas ASchwencer DZiemann WMcDonald Project Manager OELD OI&E (3)

OSD (3)

GBarber SSheppard Receptionist f1RC Participants ACRS (16)

SShowe CThomas f

b