ML19268C310

From kanterella
Jump to navigation Jump to search
Discusses Direction of Task A-14 Since Departure of Task Manager,U Potapovs.Recommends That Div of Operating Reactors Request That A-14 Be Given Sufficient Attention to Allow A-10 Nozzle Issue to Be Resolved on Time
ML19268C310
Person / Time
Issue date: 04/24/1978
From: Snaider R
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-10, REF-GTECI-RV, TASK-A-10, TASK-OR NUDOCS 8001110323
Download: ML19268C310 (2)


Text

g ATTACHMENT 2

/

wtt o naru p'

NLcLtu. Rt out.ATORv c>'essecm 7

?

]

m auw;, vow. D L poem,

/

April 24, 1978

  • ...+

Ger.eric Tesl No. A-10 MEM0 FAN 3JM FOR:

D. G. Eiseribut, Assistant Director for Systems

& Frojects, DDR THRU:

D. F. Davis, Chief, Systc<.6 tic Evaluatior. Prograrr Bren:h, DDR F R39.:

R. F. Sr. eider. Tes t Mar.e ger, Ger.eric Te sl No. A-10,

'Ed Feed eter Nor:le and Cor. trol Rod Drive Return Line No::le Cracking

  • SUEGECT:

SCHEDULIN*> 0F GENERIC TASK NO. A-10 I re:er,tls had cor..ees6tions mitt E. Sullivan, T. A. tc' O. Knight, ADE/ DSS, cor.: err,in; the status of Ger.eric Test hc. A-14, Flaw Detection *, whict must iriput signific6nt inform 6tior, into Test N. A-10.

I ex;eessed m.v co i err. oser the dire: tion of 1.-14 since the dep6rture of U. Potepovs wh: h6d beer. Test Meneger. Ted irformed me that:

1.

A ne. Ta si Mor.e ger will not be essigned until a rep 16:.ent is s

fosnd for Fotepovs.

2.

Potepovs had indic6ted that a schedule slip of a year may be ne:es sa ry.

This could result in A-14 resolution in 19E1, while 1-10 is scheduled for c:c;1etion in 1979.

As I see it, there are tw: 6ppro6ches which car. be pursued.

These are:

1.

DOE r.tr.6;e.er,t request that A-14 be given sufficient 6ttention su:t that the A-10 no::le issue could be resched on time (input due S/17/79).

2.

A-10 be signific6ntly esponded, under existing ORNL and Sandie contracts, to resc1ve the probler without input fro A-14 I had origir. ally writter. the Test Action Plan to in:lude the use of ORN; and 56ndia or. an *as-needed basis for UT review at operating p16nts, but have deleted their use in my latest revision.

i 8001110 3 M

)

---..~.

)

D. G. Eisenhut 2

April 24,1976 1 prefer thet we utilize optier.1 This will require no additionel expenditure of DM fundi en: will elst result ir: n: Overlappin; ef fort.

H0.ever, it will be ir.;erethe that at least the portion of Test A-14 related to UT dete;tior. of nozzle flavi be giver. priority by DSS.

I en. reeds to discuss this with you et the eerliest possitie opportunity.

d Richard F. Eneider Test Mar.eger cc:

J. Guibert V. Stellt

\\D Q [*jW 95001221

.