ML19268B909

From kanterella
Jump to navigation Jump to search
Contract: Finalization of Rept on Evaluation of Cost Effects on Nuclear Power Plant Const Resulting from Increase in Seismic Design Levels, Awarded to Woodward-Clyde Consultants
ML19268B909
Person / Time
Issue date: 07/25/1979
From: Hargett D
NRC OFFICE OF ADMINISTRATION (ADM), WOODWARD-CLYDE CONSULTANTS, INC.
To:
Shared Package
ML19268B906 List:
References
CON-FIN-B-6735, CON-NRC-04-79-198, CON-NRC-4-79-198 NUDOCS 7908160544
Download: ML19268B909 (5)


Text