ML19268B857

From kanterella
Jump to navigation Jump to search
Responds to Re Shutdown of Five Nuclear Power Plants Because of Seismic Concerns.Seismic Design Was Not in Accord W/Accepted Engineering Practice.Failed Piping Could Cause Loca.Plant Review Is Being Expedited
ML19268B857
Person / Time
Site: Beaver Valley, Surry, Maine Yankee, FitzPatrick  
Issue date: 05/09/1979
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Simpson R
AFFILIATION NOT ASSIGNED
Shared Package
ML19268B858 List:
References
NUDOCS 7906230047
Download: ML19268B857 (1)


Text