ML19266A268

From kanterella
Jump to navigation Jump to search
Exemptions from the Requirements of 10 CFR Part 50, Sections 50.82(a)(8)(i)(A) and 50.82(a)8(ii)
Date released: 09/23/2019 Download: ML19266A268


Exemption Spreadsheet
ML19259A111
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/16/2019
From: Balwant Singal
Plant Licensing Branch IV
To:
Singal B K, 301-415-3016
References
Download: ML19259A111 (2)
FRN Exemptions from the Requirements of 10 CFR Sections 50.82(a)(8)(i)(A) and 50.82(a)(8)(ii)
ML19163A136
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/12/2019
From: Balwant Singal
Plant Licensing Branch IV
To: Welsch J M
Pacific Gas & Electric Co
Singal B K, 301-415-3016
References
EPID L-2018-LLE-0023, FR/VOL 84, 48955, NRC-2019-0131
Download: ML19163A136 (15)
Units -Exemption Exemptions from the Requirements of 10 CFR Sections 50.82(a)(8)(i)(A) and 50.82(a)(8)(ii)
ML19163A114
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/10/2019
From: Craig Erlanger
Plant Licensing Branch IV
To:
Pacific Gas & Electric Co
Singal B K, 301-415-3016
References
EPID L-2018-LLE-0023
Download: ML19163A114 (12)
Letter Exemptions from the Requirements of 10 CFR Part 50 Sections 50.82(a)(8)(i)(A)And 50.82(a)(8)(ii)
ML19163A104
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/10/2019
From: Balwant Singal
Plant Licensing Branch IV
To: Welsch J M
Pacific Gas & Electric Co
Singal B K, 301-415-3016
References
EPID L-2018-LLE-0023
Download: ML19163A104 (16)