ML19264E949

From kanterella
Jump to navigation Jump to search
Revises 831215 Schedule for NRC 840125 Drill in Preparation for 840306-08 Federal Field Exercise.Executive Team Members Should Be Available for Entire Time
ML19264E949
Person / Time
Issue date: 01/10/1984
From: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Harold Denton, Dircks W, Palladino N
NRC COMMISSION (OCM), Office of Nuclear Reactor Regulation, NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
NUDOCS 8401250456
Download: ML19264E949 (2)


Text

O U

C JAN 101984 MEMORANDUM FOR:

Chairman Palladino William J. Dircks Executive Director for Operations Harold R. Denton, Director Office of Nuclear Reactor Regulation John G. Davis, Director Office of Nuclect Material Safety and Safeguards FROM:

Richard C. DeYoung, Director Office of Inspection and Enforcement

SUBJECT:

FEDERAL FIELD EXERCISE (FFE)

As discussed in Mr. Jordan's December 18, 1983 memorandum, the NRC will be participating with other Federal cgencies, the State of Florida, local government, and Florida Power and Light Company in a drill on January 25, 1984, in preparation for the Federal Field Exercise (FFE) on March 6-8, 1984.

In preparation for the Federal Field Exercise, training and drills have been scheduled for respoir 1 per.t.onnel.

The Executive Team (ET) schedule is as follows:

1/23 9:00 a.m. - 10:00 a.m.

ET Room Briefing on Procedures and Role 1/25 7:30 a.m. - 6:00 p.m.

ET Room Pre-FFE Drill

  • 2/27 9:00 a.m. - 10:00 a.m.

ET Room Pre-FFE Briefing 3/6 8:00 a.m. - 7:00 p.m.

ET Room First day of FFE*

3/7-8 Second and Third days of FFE**

The Executive Team members should block out the scheduled time, although your full participation during the entire time is not ant:cipated.

Minimal participation expected:

lE will provide managers to be un call during FFE hours to consult with the Regional Site Team (particularly the Director of Site Operations) and to oversee headquarters technical team support to the Site Team.

8401250456 840110 CF SUBJ CF

Multiple Addressees JAN 101984 Please contact Ken Perkins at x27361 if you have any problems with the above schedule.

This schedule supersedes that provided in Mr. Jordan's December 15, 1983 memorandum.

" Original Signed B7 R. C. DeYoung" Richard C. DeYoung, Director Office of Inspection and Enforcement cc:

J. P. O'Reilly, RII T. A. Rehm, EDO S. J. Chilk, SECY S. A. Schwartz, IE DISTRIBUTION DCS V IRB File DEPER Rdg.

RDeYoung JTaylor KPerkins TMcKenna KJackson IRE4 EPER:IE (IR :DEPER:IE IRB:D hE KBs '(c kson: kw DD. EPER:IE g P R IE DDj-/(

Dyl a

T h; nn KEPerk' SASc wartz tLJordan JMTaylbr RCDe ng 01/,f/84 3

/

01/ 5 /84 01/ (

01/] /84 01/// /84 01/ r/84 f

e J

s