ML19263E972

From kanterella
Jump to navigation Jump to search
Tentative Schedule for 790822 Meeting of ACRS Subcommittee in San Francisco,Ca,Re Combination of Dynamic Loads
ML19263E972
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/22/1979
From:
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
References
ACRS-MS-0579, ACRS-MS-579, NUDOCS 7910170300
Download: ML19263E972 (2)


Text

,

'M5 of7 h Y-I [ M' TENTATIVE SCHEDULE ACRS SUBCOMMITTEE MEETING ON THE COMBINATION OF DYNAMIC LOADS AUGUST 22, 1979 SAN FRANCISCO, CA APPROXIMATE TIME I.

EXECUTIVE SESSION (M. Bender) 8:30 am A.

Chairman's Opening Statement B.

Members and Consulting Comments II. LOADING COMBINATION HISTORY (J. Knight) 8:45 am III. LOAD, LOAD COMBINATION, AND STRESS LIMITS (TAP B-6) 9:00 am (S. Hanauer, R. Mattu)

IV. METHODOLOGY FOR COMBINING DYNAMIC RESPONSES 9:30 am (NRC/BNL - R. Bosnak, S-N. Hou/ Reich)

                                                    • BREAK ***********************

11:00 am - 11:15 am V.

FRACTURr MECHANICS ANALYSIS FOR LWR PIPING, MECHANISTIC PIPE BREAK, DETERMINISTIC ANALYSIS, DECOUPLING (NRC - J. Knight, R. Gamble) 11:15 am VI. WESTINGHOUSE - LOAD COMBINATION METHODOLOGY 12:45 pm (J. McInerny)

                                                  • LUNCH *************************

1:15 pm - 2:15 pm VII. COMBUSTION ENGINEERING - EFFECTS OF PIPE BREAK POSTULATION ON TOTAL LOAD, SEISMIC PLUS PIPE RUPTURE (T. Natan) 2:15 pm VIII. BNL - EVALUATION OF WESTINGHOUSE REPORT, WCAP-9283 2:45 pm

                                                    • BREAK ************************

3:45 pm - 4:00 pm IX. BWR MARK II AOD III, GENERIC DYNAMIC LOA 0 COMBINATION,

~

AND DYNAMIC RESPONSE COMBINATION METHODLOGY AS APPLIED TO MARK II PLANTS (GE, MARK II Owners Group) 4:00 pm 2219 031 7910170 M

2-APPROPRIATE TIME X.

ATOMIC INDUSTRIAL FORUM 5:15 pm

~

XI. ELECTRIC POWER'RESEARCH INSTITUTE 5:45 pm XII. COMMENTS BY THE SUBCOMMITTEE TO RES AND LLL ON DYNAMIC LOAD COMBIflATION RESEARCH PROGRAM 6:15 pm XIII. CAUCUS 6:45 pm XIV. ADJ0VRflMENT 7:00 pm 2219 032 O

m

TENTATIVE SCHEDULE ACRS SUBCOMMITTEE MEETING ON THE COMBINATION OF DYNAMIC LOADS AUGUST 22, 1979 SAN FRANCISCO, CA APPR0XIMAT:

TIME I.

EXECUTIVE SESSION (M. Bender) 8:30 am A.

Chairman's Opening Statement B.

Members and Consulting Comments II. LOADING COMBINATION HISTORY (J. Knight) 8:45 am III. LOAD, LOAD COMBINATION, AND STRESS LIMITS (TAP B-6) 9:00 am (S. Hanauer, R. Mattu)

IV. METHODOLOGY FOR COMBINING DYNAMIC RESPONSES 9:30 am (NRC/BNL - R. Bosnak, S-N. F J/R?iCh)

                                                    • BREAK ***********************

11:00 am - 11:15 am V.

FRACTURE MECHANICS ANALYSIS FOR LWR PIPING, MECHANISTIC PIPE BREAK, DETERMINISTIC ANALYSIS, DECOUPLING (NRC - J. Knignt, R. Gamble) 11:15 am VI. WESTINGHOUSE - LOAD COMBINATION METHODOLOGY 12:45 pm (J.McInerny) 1 :15 pm - 2:15 pm

                                                  • LUNCH *************************

VII. COMBUSTION ENGINEERING - EFFECTS OF PIPE BREAK POSTULATION ON TOTAL LOAD, SEISMIC PLUS PIPE RUPTURE (T. Natan) 2:15 pm VIII. BNL - EVALUATION OF WESTINGHOUSE REPORT, WCAP-9283 2:45 pm

                                                    • BREAK ************************

3:45 pm - 4:00 pm IX. BWR MARK II AND III, GENERIC DYNAMIC LOAD COMBINATION, AND DYNAMIC RESPONSE COMBINATION METHODLOGY AS APPLIED TO MARK II PLANTS (GE, MARK II Owners Group) 4:00 pm 2219 033

2-APPROPRIATE TIME X.

ATOMIC IriDUSTRIAL FORUM 5:15 pm

~

XI.

ELECTRIC POWER"RESEARCH INSTITUTE 5:45 pm XII. COMMENTS BY THE SUBCOMMITTEE TO RES AND LLL ON DYflAMIC LOAD COMBIllATION RESEARCH PROGRAM 6:15 pm XIII. CAUCUS 6:45 pm AIV. ADJ0VRf1 MENT 7:00 pm 2219 034 e

9

-