Supplements Response to NRC 790504 Ltr Re Violations Noted in IE Insp Repts 50-456/79-03 & 50-457/79-03.Corrective Actions:Contaminants Removed & Steel Reinspected
ML19263E959
Person / Time
Site: Marble Hill
Issue date: 06/25/1979
From: Coughlin J
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19263E957 List:
References
NUDOCS 7908060189
Download: ML19263E959 (2)


Text

0625790073 PUBLIC SERVICE INDIANA June 25, 1979 James Coughhn Ver e Pres.d. n! -

~

POr see Mr. Gaston Fiorelli United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Docket Nos.: STN 50-546 Glen Ellyn, Illinois 60137 STN 50-547

Dear Sir:

In accordance with a conversation between your Mr. Edward Schweibinz and our Mr. F. R. Hodges, Public Service Indiana requests the previously sub-mitted responses to be reviewed accordinc1.y.

Reference NRC Inspection Report No. 546/79-03; 547/79-03.

Item of Noncompliance (546/79-03-02; 547/79-03-02)

Under Corrective Action Taken and Results Achieved, second paragraph, last sentence, add "as specified in the PSI specification."

Item of Noncompliance (546/79-03-03; 547/79-03-03)

Under Corrective Action Taken ad Results Achieved, Item a), add to the end of the sentence "and the contaminants were removed and the steel reinspected."

Item b), change to read " Additional inspections were performed af ter clean up was accomplished."

Item c), change to read "The Newberg QC Engineer re-inspected prior to the placement of concrete." .

Under Corrective Action Taken to Prevent Recurrence, itea b), insert

" Engineers and" after QC in the first sentence.

Item of Noncompliance (546/79-03-04; 547/79-03-04)

Under Corrective Action Taken and Results Achieved, change to read "The Qualification Program and Actachment G of WC QAP-7 (Certificate of Qualification) for the post-tensioning embedment inspector have been updated to include this added responsibility."

JUN 2 81979 1000 East Main Street, Plainfield, Indiana 46108 317. 839.9611 7 90806011Pf. J

~

Puouc Mr. Caston Fiore111 June 25, 1979 SERVICE INDIANA Under the starred Note on page 4, change to read:

" Corrective action stated above has proven to be inadequate as revealed by subsequent NRC and PSI inspections. PSI is reviewing the adequacy of the corrective actions previously taken and is developing additional corrective measures." _

Should you have any questions concerning the above, please do not hesitate to contact me or Mr. Hodges.

Very truly yours,

\

James Coughlin Vice President-Nucicar JC:jb cc: E. R. Schweibinz e