Responds to NRC 790427 Ltr Re Violations Noted in IE Insp Rept 50-346/79-07.Corrective Actions:Use of Safety Relief Valves Insp M-46 Has Been Discontinued.New Maint Procedure Will Be Written
ML19263E742
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/17/1979
From: Jeffery Grant
TOLEDO EDISON CO.
To: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19263E737 List:
References
1-69, NUDOCS 7906250119
Download: ML19263E742 (2)


Text

.

t TOLEDO May 17, 1979  !!E)!!$(I N Docket No. 50-346 JAMES S. GRANT WCe Pres deM InePGy $w&D'y License No. NPF-3 uis 33,..,32 Serial No. 1-69 Mr. R. F. Heishman, Chief Reactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Heishman:

Toledo Edison acknowledges receipt of your April 27, 1979 letter and report enclosure 19-07. Report 79-07 references an apparent deviation from Davis-Besse Nuclear Power Station Unit No. I commitments to the NRC as an "Infrac-tion" under the heading " Notice of Violation".

Your finding has been reviewed and Toledo Edison agrees with your finding.

The Toledo Edison response is provided below:

Item: Technical Specification 6.8.1.a and 6.8.2 require in part, that applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33 shall be reviewed by the Safety Review Board (SRB) and approved by the Station Superintendent prior to implementation.

Contrary to the above, Maintenance Instruction M-46, safety /

relief valves inspection and repair, was not reviewed by the SRB and approved by the Station Superintendent prior to im-plementa tion.'

Response: The use of M-46 " Safety Relief Valves Inspection" on safety related equipment has been discontinued. A Maintenance Pro-cedure (MP) will be written and approved by the SRB prior to the next performance of safety valve repair. The procedure shall satisfy Technical Specification 6.8.1.a and 6.8.2 re-quirements.

22!8 288

x2119f9 THE T3LEDO EDISON COMPANY EDISON PLAZA 3% MADISON AVENUE TOLEDO, OHIO 43652 6

'r 9 0G250l(7

s e

May 17, 1979 Docket NO. 50-346 License NO. NPF-3 Serial No. 1-69 Page 2 A review will be conducted to insure that no other Maintenance Instructions are used to perform repair or replacement of safety related equipment.

The review, and therefore full compliance, will be completed by July 1, 1979.