ML19263E734

From kanterella
Jump to navigation Jump to search
Responds to NRC 790404 Ltr Re Violations Noted in IE Insp Rept 50-368/79-06.Corrective Actions:Controls for Connecting Test Equipment to safety-related Equipment Will Be Established
ML19263E734
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/26/1979
From: Trimlbe D
ARKANSAS POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19263E727 List:
References
2-049-14, 2-49-14, NUDOCS 7906250105
Download: ML19263E734 (2)


Text

'

= e .

.y m ARKANSAS POWEFT & LIGHT COMPANY PO3T OFFICE BOX 551 LirTLE ROCK. ARKANSAS /PPO3 (5011371-4000 April 26, 1979 2-049-11 Mr. G. L. Madsen, Chief Reactor Operations & Nuclear Support Office of Inspection & Enforcement U. S. fluclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Subject:

Arkansas fluclear One-Unit 2 Docket No. 50-368 License flo. NPF-6 IE Inspection Report No. 50-368/79-06 (File: 2-0232)

Gentlemen:

We have reviewed the subject inspection report and submit the following in response to the Item of Non-Compliance:

Item:

The facility Technical Specifications states in part that " Written procedures shall be established, implemented, and maintained covering the activities referenced below: . . .c. Surveillance and test activities of safety-related equipment."

Contrary to the above, written procedures have not been established to control the deorading of safety-related Class lE Components by the installation of non-Class lE test equipment as resulted in the failure of Channel D Core Protection Calculator on January 25, 1979 (Licensee Event Report 50-368/79-11).

Response

Arkansas Power and Light Co. (AP&L) will establish controls for connecting test equipment to safety related equipment. These controls will be in place and will have been reviewed by maintenance and operations department personnel by June 1, 1979.

2216 274 MEMBLR M' DOLE GOUTH UTit ir:EG SYSTEM 7

.f .

Mr. G. L. Madsen, Chief April 26, 1979

Response

' Con ' t.

The discussion of this violation in paragraph 7.a of the Details of Inspection Report 79-06 states in part "The licensee has been advised by the inspector that the connecting of non-Class lE test equipment to a lE seismic component degrades the design intent of that component and the component should be considered inoperable per the Technical Specifi-

  • cations (TS)".

AP&L is evaluating this interpretation and will respond with the results of tl, ir evaluation by May 26, 1979.

Very truly yours, tDavid C. Trimble Manager, Licensing DCT: CSP:lg cc: Mr. W. D. Johnson U. S. fluclear Regulatory Commission P. O. Box 2090 Russellville, AR 72801 2218 275