ML19263E627

From kanterella
Jump to navigation Jump to search
Requests Addl Reference Matl in Order to Enhance Incident Response Ctr.Addl Matls Needed Include Site Emergency Plan & Implementing Procedures & Four Sets of Site Maps Showing Environ Monitoring Stations
ML19263E627
Person / Time
Site: 07001308, 07001309
Issue date: 05/17/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Zahn L
GENERAL ELECTRIC CO.
References
NUDOCS 7906200533
Download: ML19263E627 (1)


Text

T M

d# " * %,

UNITED STATES c

pt NUCLEAR REGULATORY COMMISSION

.,fI1 ~ h REGloN til c

799 ROOSEVELT RoAo o g, GLEN E LLYN, lLLINolS 60137 MAY 171979 Docket No. 70-1308 Docket No. 70-1309 General Electric Company ATTN:

Mr. L. L. Zahn Jr.

Manager, Spent Fuel Services Operation 175 Curtner Avenue San Jose, CA 95125 Gentlemen:

We are expanding the capability of the Region III Incident Re-sponse Center and in doing so require reference material in addition to the material that is used in our inspection program.

Would you please send to this office, two controlled copies of the Site Emergency Plan and Implementing Procedures, four sets of site maps showing the location and grid or station numbers of environmental monitoring stations on and of f-site and two sets of site maps used for off-site dose determinations or evacuation and a set of diffusion overlays to be used with these site maps. This material is required for your Morris Operation.

Your cooperation in this matter is greatly appreciated.

Sincerely, C1,p h> l}

,NJames G. Kepp er Director cc:

Mr. E. E. Vo11and, Manager Morris Operation Mr. D. M. Dawson, Manager,

Licensing and Transportation Fuel Recovery Operations Central Files Reproduction Unit NRC 20b 2287 049 PDR Local PDR Mr. Dean Hansell, Office of Assistant Attorney General 7906200533

_