Responds to IE Bulletin 79-04, Incorrect Weights for Swing Check Valves Mfg by Velan Engineering Corp. Analysis of 26 Valves for Potential Overstress Is in Progress
ML19263E452
Person / Time
Site: Beaver Valley
Issue date: 04/30/1979
From: Woolever E
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7906180299
Download: ML19263E452 (1)


Text

6

'*4

'Af (412) 471 4 300 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 April 30, 1979 United States Nuclear Regulatory Commission Attention:

Boyce H. Grier, Director Region I 631 Park Avenue King of Prussia, PA 19406

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 IE Bulletin 79-04 Gentlemen:

We have reviewed the referenced bulletin and determined that a total of twenty-six (26) Velan Check Valves are installed in the Beaver Valley Power Station.

Fourteen (14) of these valves are installed in 6-inch lines. All of these lines have previously been reanalyzed using the actual valve weights and the stresses have been determined to be within the applicable code allowable values.

An additional eleven (11) Velan Check Valves are installed in 3-inch lines.

Although the reanalysis of all lines has not been completed, we do not believe that the change in valve weights will result in calculated overstresses since the valves are installed in close proximity to pipe supports.

We will notify you if any potentially overstressed conditions are discovered upon completion of the reanalysis.

The Beaver Valley Power Station is presently in a cold shutdown condition and all the reanalyses will be completed prior to start-up.

Very truly yours, 2355 070 cc: U.S. Nuclear Regulatory Comm.

E.

. Woolever Office of Inspection and Vice President, Enforcement Engineering and Construction 7906180;;2y;