ML19263E376

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-03.Status Rept Re Youngstown Welding & Engineering Co Pipe Will Be Sent No Later than 790531
ML19263E376
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 04/17/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-79-93, NUDOCS 7906130434
Download: ML19263E376 (1)


Text

P.O. BOX 529100 MI AMi, FL 33152

'D "',

U-

,, ls

__..a 0 M

d?fMU FLORIDA POWER & LIGHT COYPANY 79 APR20 A10: 05 3p,33 37,3979 We L-79-93 QM5*'b.S-c w

JEE/

Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: RII:JP0 50-335 50-250, 50-251 In response to IE Bulletin 79-03, we have contacted our Architect-Engineering finns to determine if pipe from Youngstown Welding and Engineering Company is in use or planned for use in safety-related systems at our facilities.

If such pipe is in use or planned for use, the application will be identified and an examination / sampling program will be developed. We expect to complete the above actions within 45 days of the date of this letter. A status report will be sent to you no later than May 31, 1979.

Very truly yours, fA&h1r Robert E. Uhrig Vice President Advanced Systems & Technology REU/ MAS /cph cc:

Mr. James P. O'Reilly, Region II Harold F. Reis, Esquire 2357

57 790 /4'/

p1, col'Y 7 906130y %

PEOPLE SEftvlNG PEOPLE