ML19263E329
| ML19263E329 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/25/1979 |
| From: | Fahrner W DETROIT EDISON CO. |
| To: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| EF2-46-144, NUDOCS 7906080263 | |
| Download: ML19263E329 (1) | |
Text
.
Detroit 2000 Secesc Ave Ecison saw%e May 25, 1979 EF2-46,144 Mr. G. Fiorelli, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Comission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Fiorelli:
Subject:
10CFR50.55(e) Deficiency Report on Var:.ation In Properties of Class lE Cable Jacketing
Reference:
Letter, EF2-41,417 of March 22, 1978, Edward Hines to James G. Keppler The purpose of this letter is to provide a record of the telephone conversation held between Mr. R. W.
Barr of Detroit Edison and Mr. H. S. Phillips of your organization on April 19, 1978.
In th at telephone conversation, the Nucles: Regulatcry Commission was notified that the variation in insulation thickness on IE cable jacketing had been determined to be non-reportable per 10CFR50.55(e). This item had been previously reported to your organization as a reportable item on February 27, 1978.
This letter cocolies with the request of Mr. H. S. Phillips of your o ganization to provide a written record cf the determination of non-reportability,since a written interim report on this problem was submitted.
Si.tcerely yours,
. ). ). $ tu.k.;
L c l'
W. J. Fahrner P: oject Manager Errico Fermi Unit 2 RWB/lm i
ec:
Mr. John G. Davis, Acting Director Office of Inspection and Enforcement 2356 045 Division of Reactor Inspection Programs U.S. Nuclear Regulatory Commission Washington, D.C.
20555 hb 79060802G3 S
l0