Responds to IE Bulletin 79-04 Re Incorrect Weights for Swing Check Valves Mfg by Velan Engineering Corp.Results of Investigation Will Be Available W/Completion of Pipe Stress Analysis
ML19263E292
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/16/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
JAFP-79-181, NUDOCS 7906080095
Download: ML19263E292 (1)


Text

M4A cu POWER AUTHORITY OF THE STATE OF NEW YORK

. LAMES A. FITzPATRICK NUCLEAR power PLANT S

JOHN D. LEONARD, JR.

P.o. BOX 41 Resident Manager Lycoming, New York 13093 31s 342 3840 April 16, 1979 JAFP-79-181 Mr. Boyce H. Grier, Director Uni ted States Nuclear Regulatory Comission Region i 631 Park Avenue King of Prussia, Pennsylvania 19406

SUBJECT:

NRC l&E BULLETIN 79-04 INCORRECT WEIGHTS FOR SWING CHECK VALVES MANUFACTURED BY VELAN ENGINEERING CORPORATION

Dear Mr. Grier:

The staff of the FitzPatrick plant has reviewed subject I&E Bulletin which deals with the pcssibility that incorrect valve weights were used for the analysis of piping systems during the construction phase of the plant.

At the present time, the James A. FitzPatrick Nuclear Power Plant is shutdown contingent upon the re-analysis of certain safety-related piping systems.

Because the subject of this Bulletin interfaces with the present analysis being accomplished by our architect-engineer, I have requested that our Headquarters Office take this Bulletin for action with our architect-engineer since the results of the study requested by this Bulletin may have to be incor-porated in the piping stress analysis. The Headquarters office,of the Power Authortty has concurred in this approach to the problem.

Therefore, results of the investigation requested by the Bulletin will be completed with the completion of the pipe stress analysis.

Unless further communication is received from your office on this m.atter, we will consider that this approach is satisfactory in the case of the FitzPatrick Nuclear Power Plant.

g[ l/

1 Very,_truly yours,f

~ '

+l '

,i i

j 4 r A M % ([4 JOHN D. LEONARD, JR.

JDL:brp

/

CC:

G. T. Berry, PASNY, NY0

(

g

//

G. A. Wilverding, PASNY, NYOx

)

N P. W. Lyon, PASNY, NY0 j

M. C. Cosgrove, JAF 2356 a59 y oos osogfi R. J. Pasternak, JAF Document Control Center