Proposes Min of Two Licensed Reactor Operators Be Stationed in Main Control Rooms at All Times,One of Whom Has Direct Responsibility for Feedwater Sys
ML19263E211
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/31/1979
From: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Ross D
Office of Nuclear Reactor Regulation
References
TASK-10, TASK-13-01, TASK-13-1, TASK-RR NUDOCS 7906050313
Download: ML19263E211 (2)


Text

.

CONNECTICUT YANKEE ATOMIC POWER COMPANY BERLIN. CO N N E CTIC U T P.O. BOX 270 H ARTFORD. CONNECTICUT 06101 Ta6sewone 203 666 6911 May 31, 1979 Docket No. 50-213 Director of Nuclear Reactor Regulation Attn:

Dr. Denwood F. Ross, Jr.

Assistant Director for Reactor Safety U. S. Nuclear Fegulatory Commission Washington, D. C.

20555

References:

(1)

B.11. Grier letter to W. G. Counsil dated April 14, 1979, transmitting I&E Bulletin 79-06A.

(2)

W. G. Counsil letter to B.11. Grier dated April 24, 1979.

Gentlemen:

Haddam Neck Plant Stationing of Special Operator at Auxiliary Feedwater Control _s_

In Reference (1), the NRC documented the requirement of stationing a full-time, specially instructed operator at the auxiliary feedwater controls, with direct communication with the Main Control Room operators. This was instituted at the Ibddam Neck Plant following rec eipt of the referenced bulletin.

Connecticut Yankee Atocic Power Company (CYAPCO) has determined that this requirement does not enhance the ability of the control room operators to initiate auxiliary feedwater. As stated in Reference (2), the control room operators are fully qualified to initiate auxiliary feedwater in a timely fashion if required, as demonstrated by previous plant conditions which have resulted in its use. All main and auxiliary feedwater systems are operated and controlled from the Main Control Board in the Main Control Room.

110 wever, as a result of verbal discussions with the NRC Staff, CYAPCO hereby proposes that a minimum of two licensed reactor operators be in the Main Control Room at all times, one of whom has direct responsibility for control and operation of all main and auxiliary feedwater systems.

If at any time this requirement cannot be met, a designated auxiliary feedwater operator would be stationed at the Main Control Board as an alternate means of fulfilling the intent of the Reference (1) requirement.

CYAPCO is prepared to commit to these manning requirements until permanent resolution is obtained on the question of auxiliary feedwater control.

7 9 0 6 0 5 0 3 l3 2294 1,16

4

/

Your timely and favorable response to this request will be greatly appreciated.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

,/

(( '}lJ L u '

W.'G. Counsll Vice President 2294 3!7