ML19263E199

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-059/03L-0,79-060/03L-0, & 79-063/03L-0
Date released: 10/04/2019 Download: ML19263E199


LER 79-063/03L-0 on 790501:during Startup Operation,Rods A06,F08,K08,H10,C07,C09,E05 & L11 Observed to Have 12-step Disagreement Between Various Rod Position Indications.Caused by Electronic Drift in RPI Circuitry.Rpis Recalibrated
ML19263E207
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/31/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263E207 (2)
LER 79-060/03L-0 on 790502:during Routine Startup Operation, Axial Flux Difference Deviated Greater than 5% from Target. Caused by Power Increasing Too Rapidly During Startup Operation
ML19263E203
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/31/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263E203 (2)
LER 79-059/03L-0 on 790501:fire Protection Hose Stations in Auxiliary Bldg Were Inoperable for 10-h W/O Backup Sys of Firewatch Established.Caused by Isolation of Auxiliary Bldg for Maint Taking Longer than Initially Estimated
ML19263E200
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/31/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263E200 (1)
Forwards LERs 79-059/03L-0,79-060/03L-0, & 79-063/03L-0
ML19263E198
Person / Time
Site: North Anna Dominion icon.png
Issue date: 05/31/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263E198 (1)