Text
p
- Sec 'd o
f g
UNITED STATES p
gi NUCLE AR REGULATORY COMMISSION g
< g
-;gr 5
j WASHINGTON, D. C. 20555
- Q!Re?[]
' s' O
April 19, 1979 Mr. Lawrence W. Plitch New England Regional Energy Project Post Of fice Box 514 IN RESPONSE ritFER Burlington, VT 05401 TO F01A-79-88
Dear Mr. Plitch:
This is in response to your letter dated March 23, 1979 in which you requested, pursuant to the Freedom of Information Act, a copy of all documents pertaining to the shutdown of five nuclear power plants, and the LER report submitted by Beaver Valley.
In partial response to your request, the documents, listed on the enclosed appendix, were sent to the NRC Public Document Room (PDR), located at 1717 H Street, N.W., Washington, DC 20555 in response to an earlier request (F01A-79-76).
A copy of these documents, which comprises approximately 9i pages, can be ordered frcm the PDR at a cost of $0.08 per page, as specified in 10 CFR 9.14(a) of the Commission's regulations.
Billing will be by Potomac Research, Inc., the PDR's reproduction contractor.
The NRC has not yet completed its review of the remaining documents subject to your request.
We will respond as soon as the review is completed.
Sincerely,
/r/ //
i
,,f :
f: w e
,o, J. M. Felton, Director Division of Rules and Records Office of Adm.inistration
Enclosures:
As stated
'e'SO424 ob o f'
1 APTEliDI X 79-76 1.
3/22/79
- emo to A. Schwencer from D. Uigginton, Forthcoming fleeting with Duquense Light Co.
(DLC) on Piping Stress Analysis (PSA) status.
2.
3/22/79
? emo to R. W. Reid from C. C. f;elson, Forthcoming fleeting with flaine Yankee Atomic Power Company.
3.
3/22/79 itemo to !;RR from H. R. Denton, Review of Fi ce Shut-Down Pl ants.
4.
3/22/79 fiote to D. Wigginton from W. T. Russell,
Visits / Technical lieetings.
5.
3/22/79 liRR Daily Highlight, Beaver Valley, Surry, Fitzpatrick and liaine Yankee.
6.
3/21/79 t;RR Daily Hi ghli ght, Beaver Vall ey, Surry, Fitzpatrick and liaine Yankee.
7.
3/21/79
! ote to Files from V. Stello, Telecon with Stone and Uebster.
8.
3/21/79 tiemo to F. J. Hebdon from B. J. Youngblood,
Impacts of Shutting Down five Plants for Seismic Design Reevaluation.
9.
3/20/79 liemo to Offi ce Di rectors from L. V. Gossick,
fictification to Commissioners on f4atters o f Import ant Regula tory Concern.
10.
3/20/79 fiote to Files from V. Stello, Telecon with Stone and Webster.
11.
Undated tiemo to files from A. Schwencer re:
Telephone call f rom R. Sero, Wes tinghouse.
12.
Undated Representative Visit of Piping Systems.
13.
Undeted Paper - Architect Engineer - Stone and Uebster.
14.
3/13/79 f?RC Press Release 79-52, ??RC Staf f Orders Five fluclear Plants Shut Down to Resolve Piping Questions.
15.
Undated Paper - Problem Identi fication.
A
~ 16.
3/12/79 Daily Highlight.
17.
2/23/79 Memo to R. H. Vollmer from E. L. Jordan, Stress Analysis for Beaver Valley Safety Injection Piping.
18.
1/18/79 Memo to E. L. Jordan from R. R. Keimi g, Beaver Valley Power Station Unit 1, Safety Injection Piping Stress Analysis - Request for Additional Technical Review ( AITS No. F 14741HZ).
19.
3/19/79 Statement of H. R. Denton before House Committee on Interior and Insular Affairs.
20.
3/15/79 Note to Docket File 50-334 from D. Wigginton, Meeting Summary - Pipe Stress Calculations Using "Pipestress."
21.
4/17/70 Ltr. to E. G. Case from R. L. Sharpe, Beaver Valley Power Station.
22.
2/19/68 Ltr. to P. A. Harris f rom N. M. Newma rk,
Transmittal of two reports re:
Survey I & II and Cooper Nuclear Station.
23.
11/3/72 Ltr. to E. G. Case from W. J. Hall, Transmittal of Newmark Engineering Consul tants Commentary and Final Report on Fitzpatrick Nuclear Power Plant.
24.
Undated Paper entitled Maine Yankee FSAR.
25.
Undated Seismic Maps regarding the Five Shutdown Plants.
-