APPENDIX A NOTICE OF VIOLATION Northeast Nuclear Energy Company Docket No. 50-423 This refers to the inspection conducted by a representative of the Region I (Philadelphia) office of the NRC at the Millstone Nuclear Power Station Unit 3, Waterford, Connecticut, of activities authorized by NRC Construction Permit CPPR-ll3.

During this inspection conducted on August 30-September 1,1978, the following apparent item of noncomplicnce was identified.

This item is an infraction.

10 CFR 50, Appendix B, Criterion V requires in part " Activities affecting quality...shall be accomplished in accordance with these instructions, procedures, or drawings".

The Millstone Nuclear Power Station Unit 3 PSAR (Preliminary Safety A..alysis Report) Section 17.1.1.9 requires that NUSCO contractors are responsible for developing and implementing procedures for the control of special processes such as welding....in accordance with applicable codes, standards, specifications and procedures.

Richmond Engineering Company drawing D-74-412 Revision 9 specifies 1/4-inch size for the fillet weld on the access hatch for boric acid tank No. RCN-204.

Contrary to the above, on August 18, 1978 the fillet weld on the access hatch for Boric Acid Tank No. RCN-204 was less than 1/4-inch size over approximately a six-inch length.

This weld had been examined and accepted without identification and correction of the nonconforming condition.