ML19263D795
| ML19263D795 | |
| Person / Time | |
|---|---|
| Site: | 07106058 |
| Issue date: | 03/23/1979 |
| From: | Hall W TELEDYNE, INC. |
| To: | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 7904130265 | |
| Download: ML19263D795 (1) | |
Text
_... _ _.
h_
~
'/PTELEDYNE ENERGY SYSTEMS 110 W. TIMONIUM HD.
TIMONIUM, M D. 21093 f
PHON E: 301252 8220
_y TELEX: 8-7780 CADLE: TELISES
- ,',i \\ $0 f
\\
/
PROTECTIVE PACKAGING DIVISION
/
'd March 23,01579 t
Refer to:
PPI-WCH-127
,p P' 'N
'\\
Director, Nuclear Material
^
Safety and Safeguards R
U.S. Nuclear Regulatory Commission h
GAR 2 81970 >
Washington, D.C.
20555 twM
/
y,et c :r"
Subject:
Nonconformance of B-3 Shipping Cask CO C s
Reference:
(a) 10 CFR 21.21 D
(b) 10 CFR 71.61 (c)
Union Carbide letter of 12 March 1979 Gentlemen:
This letter is submitted concurrent with reference (c) in compliance with references (a) and (b).
Teledyne Energy Systems has acquired the activities of Protective Packaging, Inc., and, as such, has assumed its functions.
is our understanding that the existing 3-3 casks which apparently It do not conform to the drawings referenced in NRC Certificate of Compliance USA /6058/B, are being withheld from further use pending analysis and decision for disposition.
Sincerely, L&
William C.
Hall Manager WCH:sab cc:
Director, Region I Office of Inspection & Enforcement (NRC-PA)
Marcus H.
Voth, Manager Nuclear Operations, Union Carbide p
].'l, j.
'5 Il
=?
'3,' i
,'3, Dr.
T.
S.
Baer 3'
i Nuclear Engineering Company
[
N
(
_ _ _...... _..