ML19263D579

From kanterella
Jump to navigation Jump to search
Responds to NRC 790215 Ltr Re Violations Noted in IE Insp Repts 50-498/79-02 & 50-499/79-02.Corrective Actions: Outdated Drawings,Detected by Addl Surveillance of Documents,Removed from Field
ML19263D579
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/16/1979
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19263D575 List:
References
ST-HL-AE-329, NUDOCS 7904130033
Download: ML19263D579 (2)


Text

,

Houston 9 Lighting

& Power ComJany Electric Tower March 16, 1979 l PO Box !700

_ <l Houston. Texas 77001 ST-llL-AE-329 SFN
C-0570 P

}

Fir. W. C. Seidic, Chief Reactor Construction G Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

RESPONSE TO NRC INSPECTION FINDING S0lfff! TEXAS PROJECT ELECTRIC GENERATING STATION DOCKET NOS. 50-498/79-02 AND 50-499/79-02

Dear Mr. Seidle:

The following is llouston Lighting 6 Power Company's (llLGP) response to the infraction identified in IE Inspection Report Nos.

50-498/79-02 and 50-499/79-02 dated February 15, 1979.

Failure to Control Superseded Drawings

1. Corrective Action Taken The drawings identified as outdated were removed from the field during the NRC Inspection. An additional surveillance of controlled document holders was performed to detect outdated drawings.

The results of this surveillance indicated that the problem reported appears to be an isolated instance.

2. Recurrence Control A monthly surveillance is performed on controlled documents. During the month of February this sur-veillance was increased to determine any additional problem areas. No additional problem areas were found. Ilowever, addi nun..I surveillance in this area will be pedurmed during the months of March and April to cr.sure that the problem found is an isolated occurence.

2 79041300

If(xiston trypting, & fimer Company b!r. Seidle b! arch 16, 1979 Page Two The completion date for the corrective action was January 24, 1979. The recurrence control has been implemcated and will be an on-going activity.

Very truly yours

.4.W E. A. Turner, Vice President Power Plant Construction G Technical Services EAT:rka cc: ?!cssrs. G. W. Oprea, Jr.

R. A. Frazar D. G. Barker t 1. L . Borchelt (CPL)

J. W. h!oore (CPL)

J. B. Poston (CPS)

R. C. blocke (CPS)

R. L. Ilancock (COA)

11. L . Peterson (COA)

C. W. Vincent (B6R)

STP RMS