ML19263D402

From kanterella
Jump to navigation Jump to search
Supplies Info Re Request to Document Change in Activity in Cell 3,once Used to Process Fission Product Moly 99.Cell 3 Has Been Idle for Months & GE Wishes to Utilize It for Routine Nondestructive Tests on Irradiated Reactor Fuel
ML19263D402
Person / Time
Site: 07000754
Issue date: 01/30/1979
From: Moschner R
GENERAL ELECTRIC CO.
To: Blaylock J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 7903290186
Download: ML19263D402 (1)


Text

~.

-=

t PD/L

~

U GENERAL h ELECTRIC'!

"^" "" ""

GENERAL ELECTRIC COMPANY, P.O. BOX 460, PLEAsANTO;4

, CALIFORNIA 94566 D1 VISION Re: SG-79-31 January 30, 1979 g

William J. Dircks Director s

Office of Nuclear, Material

-[

Safety and Safeguards J

U. S. Nuclear Regulatory Commission 17 Washington, D. C.

20555

~ '..

i-

.J.

j Attention:

Mr. James Blaylock

Subject:

UTILIZATION OF CELL 3 (MBA34)

Dear Mr. Blaylock:

-]-

The following is provided in accord with your request to document in activity in Cell 3.

states it is used to process fission product Moly 99.As you recall, t e change destructive tests on irradiated reactor fuel.for ne, non-The fuel examinations are as described in the portion of the FN ICA 21, Cell 1.

The windows in this Cell require repair so the change to the ae to unused Cell 3 is requested.

There will be no processing of Fission Pro for the Cell 3 work.

during the fuel examination project.

to the original work location is desired.GE-VNC will advise you.when a return Sincerely, R. A. Masch er, Acting Manager Nuclear Safety and Quality Assurance RAM:ap

/

1dw *N)

~

79032901Ro