Oedc QA Audits Conducted at Hartsville & Phipps Bend Sites Nuclear Components Manual ASME Requirements for Fabrication & Production Have Not Been Entirely Incorporated in TVAs Const Enqineering or Std Operating Procedures
ML19263D342
Person / Time
Site: Hartsville, Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 02/23/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
References
NUDOCS 7903270476
Download: ML19263D342 (1)


Text

,

'J 4

,2Al'y TELEPHONE REPORT

~"

'da O((g ts.v1.11e Units 1, 2, 3, 4 50-518,519,52.511 FACIT.ITY:

p s di n( 1?ni t s 1 & 2

  • ~

DOCKET #: 50-553, 554 DAIZ:

2/23/79

.g g. 3:45 pm LIC. OCC. f:

SU3 JECT:

OEDC QA ASME Audit Deficiencies

~

~

Terry Twler ealked '8)2-4395 1.5%-'lI?!10.M OP OelmnME:

t nmr na A,tM rs con.fucted at Hartsville and Phipps Bend Sites disclosed that the Nuclear Components Manual (NOO, ASME requirements for fabrication and production ha've not been entirely incorporated in TVA's a

construction Engineering Procedures or Standard Operating Procedures.

The specifics wer'e given for Phipps Bend & TVA will notify RII of Hartsville 4

<f oricirr this week when thef make their confirmation call.

a areas

___ Yellow Creek is being constructed to the same Standarized QA Program howev,er

_all CEP's will be corrected prior to any work at this afte.

S.ic ucha.g

~

Written report due 3/2fD79.