ML19263D342
| ML19263D342 | |
| Person / Time | |
|---|---|
| Site: | Hartsville, Phipps Bend |
| Issue date: | 02/23/1979 |
| From: | TENNESSEE VALLEY AUTHORITY |
| To: | |
| References | |
| NUDOCS 7903270476 | |
| Download: ML19263D342 (1) | |
Text
,
'J 4
,2Al'y TELEPHONE REPORT
~"
'da O((g ts.v1.11e Units 1, 2, 3, 4 50-518,519,52.511 FACIT.ITY:
p s di n( 1?ni t s 1 & 2
- ~
DOCKET #: 50-553, 554 DAIZ:
2/23/79
.g g. 3:45 pm LIC. OCC. f:
SU3 JECT:
OEDC QA ASME Audit Deficiencies
~
~
Terry Twler ealked '8)2-4395 1.5%-'lI?!10.M OP OelmnME:
t nmr na A,tM rs con.fucted at Hartsville and Phipps Bend Sites disclosed that the Nuclear Components Manual (NOO, ASME requirements for fabrication and production ha've not been entirely incorporated in TVA's a
construction Engineering Procedures or Standard Operating Procedures.
The specifics wer'e given for Phipps Bend & TVA will notify RII of Hartsville 4
<f oricirr this week when thef make their confirmation call.
a areas
___ Yellow Creek is being constructed to the same Standarized QA Program howev,er
_all CEP's will be corrected prior to any work at this afte.
S.ic ucha.g
~
Written report due 3/2fD79.
Md83 I
. ipS5CIAI/ COPY j
.