ML19263D294

From kanterella
Jump to navigation Jump to search
Forwards LER 79-017/03L-0
Date released: 10/04/2019 Download: ML19263D294


LER 79-017/03L-0 on 790227:variations Occurred in HPCI Turbine Speed During Normal Operation While Attempting Test of HPCI Pump Rate Flow.Caused by Turbine Control Loop Failure.Controls Recalibrated & Actuator Replaced
ML19263D297
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/14/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263D297 (1)
Forwards LER 79-017/03L-0
ML19263D293
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/14/1979
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263D293 (1)