e Commonwealth Edison one First Natioqal Plaza. Chicago, Ilknots
~'
Address Reply to: Post Office Box 767 ChicaLo, Illinois 60690 March 6, 1979 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Quad-Cities Station Units 1 & 2 Secondary Containment Leak Rate Test Facility Operating License DPR-29 and DPR-30 NRC Docket Nos. (50-2543 nd (0-26
Dear Mr. Keppler:
On January 12, 1979, a Secondary Containment Leak Rate Test was performed on the combined reactor building volumes of Quad-Cities Station Units 1 an'd 2.
In accordance with the requirements of Section 6.6, Table 6.6-1 of the Technical Specifications, a summary report of that test is enclosed.
The test report indicates that the standby gas treatment system is capable of maintaining 1/4 inch of water vacuum in the secondary containment building under calm wind conditions with a flow rate of no more than 4000 cfm.
Please address any questions you may have concerning this matter to this office.
Very truly yours, 5-Robert F.
necek Nuclear Licensing Administrator Boiling Water Reactors enclosure 7 9 0 3 2 6 0 2 g6