Issue date: 02/20/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19263C497 List:
References
LER-79-017-01T, LER-79-17-1T, NUDOCS 7902260355
Download: ML19263C500 (2)


LER-1979-017, /01T-0 on 790212:during Axial Power Distribution Monitoring Sys Failure on 790206,FQ Survey Computer Program Could Not Monitor Axial Power Distribution.Caused by Incorrect Power Inputs from Process Computer
Event date:
Report date:
3381979017R01 - NRC Website

text

LICENSEE EVENT REPORT CONTROL HLOCK: l l

l l

l l

lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

IO lil I V A l N l A l S l 1 l@l 0 l0 l-l 0 l 0101010 l-1010 l@l4 l1 11 11 11 l@l l

l@

7 8 9 LICENSEE COD [

14 15 LICENSE NUYBut 23 26 LICENSE TYPE 30 57 LATb3 C ON' T EislL @l0l5 0 l 0 l 0 l 3 l 3 l 8 l@l 0 l 2 11 2 l 7 l 9 l@l d j j d J d@

l O

i 7

8 LU 61 DOCKE T NUYBEH 68 63 LVENT DALE 14 7S HEPORT DATE 80 EVENT DESCRIPTION AND PROBADLE CONSEQUENCES h

[ On 2-12-79, it was discovered thal _during_an_axiitl_ power _distributico monitorinq l

o 2

g i system failure, on 2-6-79, the FQ Survey Computer Program was not capable of moni-l toring the axial power distribution, as required by T.S. 4.2.6.1, 1

0 4

gljiseventisreportableasperT.S.6.9.1.8.i.

O s

O ti l

0 7

1 0

a i I

so i

e9 C DE CODE SUBCO E COMPON ENT CODE SUSC D'E SV DE O

9 IX lX l@ U@ l_Z_j @ l Z 17 l Z 1717 l 7 l@ lZ l@ [Z_ J @

7 8

9 10 11 12 13 1R 19 20 SEOUENTI A L OCCUR RE NCE ftFFORT R E VISION LE H EVENT YE AR HEPORT NO.

CODE TYPE N O.

@ gij,eg'HOl7 l9 l l-l l0l1l7l l/l l0 l1 l lT l-l0 l R,T,

_ 21 22 23 24 2G 21 28 29 30 31 32 At Et A I Or O

LA T f T4 HOURS 22 S B IT D FO P B.

SU PLIE i MAN FAC IER lXjgl34Z [ g l5Zlg Zl@

l0 l0 l0 l0 l lY l@

l N ]@

l Z l@

Z [ 9 l 9 l 9 l@

33_

3 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l: lOI The cause of the event was that a power level of anproximately 86 ; was inputed to the l li li l l FQ Survey Program by the Plant Process Computer while the actual nower level was 97 ' I l Corrective action was to correct the power inputs from the process computer.

No l

, 7 l i l 31 l further corrective action was required.

1 I t 14 I l

7 8 9 80 ST S

% POWEH OTHER -TATUS DISC V HY DISCOVE RY SCRIPTION [i l 5 l [_EJ@ l 0 l 9 7 g N/A l

l A lgl FQSurveyProgramiest l

4 4S 4

80 A MVilY CO 1ENT nt t r ASt D OF RELE ASE AVOUNT OF ACTIVITY LOCATION OF RELEASE li Ici LZj @ tZjgl N/A l

l N/A

?

H 9 10 11 44 45 83 PERSONNEL E XPOSURES nut 3BER 1YPE DE SCRIPTION 1010101@l ZI@l N/A l

i >

8o ptnSONNEtiN;uNiEs OESCHipnm@

NUvBo, fWl 101010 l@l N/A l

7 8 9 11 12 80 LOSS OF On DA*J AGE TO FACit i TY h TYPE DESCHWTION v

li 191 IZ l@l N/A l

1 8 9 10 80 issui"@""iMs'ene nm @

7 9 0 2 26 03ff NRC USE ONLY [N._fl N/A l

lllllllllllllj 2 O t

B O 10 63 69 80 5 O

I 703-894-5151 E,

NAME OF PREPAllER PHONE:

Virginia Electric and Power Company North Anna Power Station, Unit #1

Attachment:

Page 1 of 1 Docket No.

50-338 Report No.

LER 79-017/0lT-0

Description of Event

On 2-12-79, it was discovered that the FQ Survey Computer Progra:a was not capable of monitoring the Axial Power Distribution during an Axial Povier Distribution Monitoring System failure on 2-6-79.

This is contrary to T.S. 4.2.6.1.

This event is reportable as per T.S. 6.9.1.8.i.

Probable Consequences of Occurrence:

The limit on axial power distribution ensures that FQ will be controlled and monitored on a more exact basis through use of the APDMS or the incore moveable detectors when operating above 95% of Rated Thermal Power.

Comparison of the APDMS results after the system was restored to the results before the system failed, showed that the peak FQ values and % margins between peak and limit values had not changed during the APDMS failure. There was no change in power level or any rod movement that would change the core power configuration during the eight hours when the APDMS was not available.

As a result, the safe operation of the plant was not affected and the public health and safety was not endangered.

Cause of Occurrence:

The cause of the event was that a false power level was inputed into the FQ Survey Program from the plant process computer.

On 1-24-79, the process computer failed and after being restored, a computer constant was changed in the process computer's thermal power calcula-tion by an unknown mechanism.

As a result, a power level of approximately 86% was inputed into the FQ Survey Program.

Since the FQ limit changes with power level, the Survey program was incapable of calculating the correct % margins between the actual FQ values and the FQ limit.

The program was able to correctly calculate the actual FQ value.

Immediate Corrective Action

The correct computer constant was entered into the process computer resulting in the correct power level inputed into the FQ Survey Program.

Scheduled Corrective Action:

No further corrective action was required.

Actions Taken to Prevent Recurrences:

A program to monitor constants after restoration of the computer following a failure is currently under investigation.