ML19263B852

From kanterella
Jump to navigation Jump to search
Forwards First Interim Rept on Inadequate Design of Heating, Ventilation & Air Conditioning Penetrations
Date released: 10/04/2019 Download: ML19263B852


First Interim Rept on Inadequate design:as-built Configuration of Heating,Air Conditioning & Ventilating Penetrations Were Not Accounted for in Containment Design. Caused by Design Spec Error
ML19263B855
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/12/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19263B855 (1)
Forwards First Interim Rept on Inadequate Design of Heating, Ventilation & Air Conditioning Penetrations
ML19263B851
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/12/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263B851 (1)