ML19263B369

From kanterella
Jump to navigation Jump to search
Forwards Copy of Risk Assessment Review Group Rept to Us NRC (Lewis Rept).Commission Is Presently Developing Policy Statement Concerning Rept
ML19263B369
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/27/1978
From: Gray J
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Mccollom K, Mark Miller, Paxton H
AFFILIATION NOT ASSIGNED, Atomic Safety and Licensing Board Panel, OKLAHOMA STATE UNIV., STILLWATER, OK
References
NUDOCS 7901180113
Download: ML19263B369 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION 3e 3 ?. m

, h J

W ASHIN GT oN, D. C. 20Z5 a

O [4UMb ci j

NRC PUl LIC DOCUMENT ROOM December 27, 1978 Marshall E. Miller, Esq., Chairman Dr. Kenneth A. McCollom, Dean Atomic Safety and Licensing Board Division of Engineering, U.S. Nuclear Regulatory Commission Architecture t< Technology Washington, D. C. 20555 Oklahoma State University Stillwater, Oklahoma 74074 Dr. IIugh C. Paxton c>

q 1229-41st Street b

Los Alamos, New Mexico 87544 o

Pk 1\\

hq,1g\\g

~

i

,,[

H In the Matter of Portland General Electric Company, c_tt

',f j d'

(Trojan Nuclear Plant)

Docket No. 50-344 (Control Building) b'

  • I\\

Gentlemen:

Copies of NUREG/CR-0400, " Risk Assessment Review Group Report to the U.S. Nuclear Regulatory Commission" (the " Lewis Committee Report"),

have been furnished directly to the Licensing and Appeal Board Panels for the use of the members of this Board. Under cover of copies of this letter, the NRC Staff is enclosing copics of the Lewis Committee Report for the information of the parties to this proceeding. The Commission is pre-sently in the process of developing a policy statement concerning the report.

Sincerely, 4/ l b 7

Jo ph R. Gray Counsel for NRC Staff

Enclosure:

As stated cc w/o encl:

Individual Board Members ASLB Panel ASLAB Panel Docketing and Service Section cc w/ encl:

Rest of Service List for Trojan Control Building 7901180l/3

..